TorqFix

Timing chain replacement: VW New Bettle 1.8 Turbo APH AVC camshaft chain

Timing chain replacement — VW New Bettle 1.8 Turbo APH AVC camshaft chain. 54 source steps. Check the document conditions against your vehicle.

54 steps

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Opens: coolant, fuel
  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Replacement notes from the steps (read the conditions below): Renew the gasket

Don't miss

  • Mark the timing chain and camshaft gearwheels to each other with paint
  • Do not mark the chain with a centre punch or anything similar

📋 Procedure

Preparation and removal

  1. Installation is in the reverse order of removal
  2. Before disconnecting the battery cable, check the audio system security code
  3. Disconnect the battery earth cable
  4. Remove the engine lower cover
  5. Camshaft gearwheel holding tool:
  6. Turn the crankshaft to TDC for cylinder 1
  7. Note: Turn the engine clockwise
  8. Align the timing marks
  9. Drain the coolant
  10. Collect the escaping fluid in a container
  11. Remove the secondary air pump motor and bracket if fitted
  12. Disconnect the fuel lines
  13. Collect the escaping fluid in a container
  14. Note: Plug the ends of the fuel lines
  15. Disconnect all the hoses from the cylinder head
  16. Disconnect the injector wiring
  17. Disconnect the cylinder head electrical connections
  18. Move the harness aside
  19. Remove as shown
  20. Remove the heat shield
  21. Remove the air hose
  22. Remove the bracket
  23. Remove as shown
  24. Remove the bolts
  25. Remove the ancillary drive belt
  26. Remove the ancillary drive belt tensioner
  27. Remove the timing belt upper cover
  28. Disconnect the ignition coils
  29. Remove the ignition coils
  30. Remove the valve cover
  31. Valve cover
  32. Remove the timing belt from the camshaft gearwheel
  33. Camshaft position sensor
  34. Remove the camshaft gearwheel
  35. Sensor ring
  36. Remove the woodruff key
  37. Remove the camshaft sensor
  38. Remove the ring
  39. Fit the timing chain holding tool
  40. Do not overtighten
  41. Check the position of the camshafts
  42. Mark the timing chain and camshaft gearwheels to each other with paint
  43. Note: Do not mark the chain with a centre punch or anything similar
  44. Remove the camshaft bearing caps
  45. Remove the bolts
  46. Remove the camshafts together with the timing chain
  47. with tensioning device

Installation and checks

  1. Clean off the sealing surfaces
  2. Apply sealant
  3. Renew the gasket
  4. Note: Apply sealant before fitting
  5. Inlet/exhaust side of the engine:
  6. Fit a new camshaft cap seal
  7. Refill the cooling system

📐 12 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 12 workshop diagrams for this job Ask about your VW — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.