TorqFix

Checking secondary air inlet valve N112: VW Golf IV / Bora (1J) (AEH, AKL, APF)

Checking secondary air inlet valve N112 — VW Golf IV / Bora (1J) (AEH, AKL, APF). 11 source steps. Check the document conditions against your vehicle.

11 steps 3 engine codes Showing one source document; this title group contains 4 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Golf IV / Bora (1J)

  • Replacement notes from the steps (read the conditions below): Renew secondary air inlet valveN112. Renew engine control unit 24.

Don't miss

  • Start engine and run at idling speed. When the secondary air pump motor V101 runs, a vacuum must be perceptible at the union of the secondary air inlet valve N112.
  • Pull 2-pin connector off valve and connect voltage testerV.A.G 1527B to disconnected connector. Check activation whilst secondary air pump motor V101 is running: LED must light up.
  • Connect voltage testerV.A.G 1527B to contact 1 of disconnected connector and to earth: LED must light up.

🔧 Engine codes recorded for this source

📋 Procedure

  1. Pull upper vacuum hose (arrow) off secondary air inlet valve N112.
  2. Start engine and run at idling speed. When the secondary air pump motor V101 runs, a vacuum must be perceptible at the union of the secondary air inlet valve N112.
  1. Check activation of valve:
  2. Pull 2-pin connector off valve and connect voltage tester V.A.G 1527B to disconnected connector. Check activation whilst secondary air pump motor V101 is running: LED must light up.
  1. Renew secondary air inlet valve N112.
  1. Connect voltage tester V.A.G 1527B to contact 1 of disconnected connector and to earth: LED must light up.
  1. Check wire between 2-pin connector contact 1 and fuse 43 for open circuit referring to current flow diagram. Wire resistance: max. 1.5 Ω.
  1. Connect 121-pin adapter cable V.A.G 1598/31 to control unit wiring harness. The engine control unit remains disconnected.
  2. Check wire between test box socket 71 and 2-pin connector contact 2 for open circuit referring to current flow diagram. Wire resistance: max. 1.5 Ω.
  3. Additionally check wire for short circuit to battery positive and earth. Specification: ∞ Ω.
  1. Renew engine control unit (repair group 24).

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.