TorqFix

Timing chain replacement: Suzuki Grand Vitara my05 J20 (Chain)

Timing chain replacement — Suzuki Grand Vitara my05 J20 (Chain). 82 source steps. Check the document conditions against your vehicle.

82 steps 1 engine code

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Special tools named: locking pin
  • Replacement notes from the steps (read the conditions below): Always replace the timing chain Renew the sealant Always use new gaskets

Don't miss

  • Always replace the timing chain
  • If the timing chain is to be re-used, mark the running direction before removal
  • Never turn the engine in the direction opposite to that of normal operation
  • Align the gold plate on the timing chain with the mark on the crankshaft gearwheel
  • Align the yellow plate on the timing chain with the mark on the idler gearwheel

🔧 Engine codes recorded for this source

📋 Procedure

Special tools

  • Crankshaft pulley removal
  • Counter-hold tool
  • Puller

Warnings and recommendations

  1. Unless otherwise advised by the manufacturer, the following procedures are recommended:
  2. Always replace the timing chain
  3. If the timing chain is to be re-used, mark the running direction before removal
  4. Never turn the engine in the direction opposite to that of normal operation
  5. Note: Avoid bending, torsion or traction

General

  1. Before disconnecting the battery cable, check the audio system security code
  2. Check the timing marks before timing chain removal

Removal

  1. Disconnect the battery
  2. Remove the engine
  3. Refer to 'Engine removal'
  4. Remove the dipstick
  5. Remove the oil sump
  6. Remove the ignition coils
  7. Disconnect the breather hose
  8. Disconnect the positive crankcase breather
  9. Remove the bolts
  10. In the order shown
  11. Remove the cylinder head cover
  12. Remove the crankshaft pulley centre bolt
  13. Note: Use a wrench to counter-hold
  14. Remove the crankshaft pulley
  15. Use a special tool:
  16. Remove the idler pulley
  17. Remove the coolant pump pulley
  18. Remove the ancillary drive belt tensioner
  19. Remove the timing chain cover
  20. Turn the crankshaft clockwise
  21. Align the timing marks
  22. Slowly turn the inlet camshaft anti-clockwise
  23. Press the slack guide to compress the tensioner
  24. Lock the tensioner; use a locking pin
  25. Remove the tensioner
  26. Remove the camshaft gearwheel bolts
  27. Note: Use a wrench to counter-hold
  28. Remove the timing chain and gearwheels together
  29. Remove the guide plates
  30. Remove the chain tensioner
  31. Remove the idler pulley
  32. Remove the timing chain
  33. Check the gearwheels, tensioner and idler(s) for damage and wear
  34. Correct if necessary

Installation

  1. Check the timing marks
  2. Fit the idler pulley
  3. Lubricate lightly using engine oil
  4. Align the dark blue plate on the timing chain with the marks on the idler gearwheel
  5. Align the gold plate on the timing chain with the mark on the crankshaft gearwheel
  6. Refit the chain guide(s)
  7. Lubricate lightly using engine oil
  8. Compress the tensioner
  9. Lock the tensioner; use a locking pin
  10. Fit the locked tensioner
  11. Remove the locking pin
  12. Refit the chain guide(s)
  13. Lubricate lightly using engine oil
  14. Check the timing marks
  15. Check the timing marks
  16. Fit the timing chain
  17. Align the yellow plate on the timing chain with the mark on the idler gearwheel
  18. Align the dark blue plates on the timing chain with the marks on the camshaft gearwheels
  19. Refit the camshaft gearwheels and chain
  20. Tighten the camshaft gearwheel bolts
  21. Note: Use a wrench to counter-hold
  22. Lock the tensioner; use a locking pin
  23. Remove the locking pin
  24. Rotate the engine 2 rotations by hand
  25. Check the timing marks
    The specified rotation and the following timing-mark check form a verification step. Do not treat rotation alone as confirmation that the timing is correct. Recheck the marks at this point in the sequence before continuing with the subsequent refitting steps.
  26. Lubricate the timing chain and other moving parts
  27. Fit the timing cover
  28. Renew the sealant
  29. Fit the ancillary drive belt idler pulley
  30. Refit the coolant pump pulley
  31. Fit the cylinder head cover
  32. Renew the sealant
  33. Always use new gaskets
  34. Refit the dipstick
  35. Tighten the bolts
  36. In the reverse order to that shown
  37. Reconnect the breather hose
  38. Refit the ignition coil(s)
  39. Refit the oil sump
  40. Renew the sealant
  41. Refit the engine

📐 18 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 18 workshop diagrams for this job Ask about your Suzuki J20A — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.