Gearbox removal & installation: Citroen C4 (B71) 2010 - MCP - EP6CDT
Gearbox removal & installation — Citroen C4 (B71) 2010 - MCP - EP6CDT. 77 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
- Opens: gearbox oil
- Replacement notes from the steps (read the conditions below): Renew the nut Renew the bolts
🔧 Engine codes recorded for this source
📋 Procedure
Preparation and removal
- Lever(s):
- Refit all parts in the reverse order of removal
- Before disconnecting the battery cable, check the audio system security code
- Raise the vehicle
- - Bleeding the hydraulic circuit
- Use a diagnostic tool
- Disconnect the battery earth cable
- Remove the front wheels
- Remove both front wheel arch liners
- Remove the air ducts
- Remove the air inlet
- Remove the battery cables
- Remove the battery
- Remove the battery tray
- Disconnect the gearbox wiring
- Disconnect the wiring loom bracket
- Move the harness aside
- Disconnect the electrical wiring from the gearbox
- Disconnect the earth cable from the gearbox
- Remove the bolts from the engine wiring bracket
- Move the harness aside
- Remove the lower spoiler
- Drain the gearbox oil
- If applicable:
- Remove the height-control sensor
- All vehicles:
- Remove the lower cross member bolts
- Note: At both sides of the vehicle
- Remove the reinforcement brace
- Note: Left-hand side
- Disconnect the stabiliser link(s)
- Note: At both sides of the vehicle
- Move aside
- Disconnect the lower arm ball joints
- Use a special tool
- Note: At both sides of the vehicle
- Disconnect the exhaust support
- Subframe:
- Unclip the wiring
- Unbolt the pendulum support
- Gearbox drain plug:
- Remove the studs
- Gearbox support:
- Place a trolley jack under the subframe
- Remove the subframe bolts
- Lower the subframe
- Disconnect the tie rods
- Remove the power steering heat shield
- Remove the power steering line mount
- Move the power steering pipe aside
- Remove the subframe
- Remove the front exhaust pipe
- Remove the drive shafts
- Remove the lower cross member
- Remove the front subframe extensions
- Protect the gear-shift hydraulic unit
- Use the special tool
- Remove the engine to gearbox bolts
- Remove the turbocharger coolant pump
- Move aside
- Remove the nut
- Support the engine
- Remove the starter motor
- Secure to the vehicle
- Remove the engine/gearbox upper attaching bolts
- Use a trolley jack to support the engine
- Remove the gearbox support
- Gearbox support:
- Lower the engine/gearbox slightly
- Remove the gearbox
- Wheel nuts
- Starter motor
Installation and checks
- Renew the nut
- Renew the nut
- Renew the bolts
- Renew the nut
- Renew the nut
Other CITROEN procedures
- Citroen C4 B71 2010 MCP DV6C gearbox removal & installation
- C1 (B4) EB2/ C4 (B71) EB2DTS/ C4 Cactus EB2
- Citroen C4 MCP DV6TED4 gearbox removal & installation
- Citroen C4 Picasso 2013 MCM EP6CDT clutch replacement
- Citroen C4 Picasso MCP DV6C gearbox removal & installation
- Citroen C4 Picasso MCP DV6TED4 gearbox removal & installation
- EP3, EP6 Drive belt check/replacement
- EP6DT - direct injection
- EP6DT - direct injection
- C4 Picasso - MCP - EP6DT
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.