Removing, installing and tensioning injection pump toothed belt (engine codes ACV, AHY, AJT, AUF, AXG, AXL, AYC, AYY): VW
Removing, installing and tensioning injection pump toothed belt (engine codes ACV, AHY, AJT, AUF… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
- Timing references: follow the source instructions for shaft position, timing marks and any locking tools
- Special tools named: dial gauge
Don't miss
- Marks (arrows) on injection pump pulley/bracket (C) and flywheel/clutch housing (A) or drive plate/clutch housing (B) must align.
- This condition is only achieved every 2nd TDC position.
- Mark direction of rotation of toothed belt
- Hold injection pump drive pulley with counterhold tool3036; unscrew securing bolt and remove toothed belt
- Check that mark on injection pump pulley and injection pump are aligned (arrows).
🔧 Engine codes recorded for this source
This source is from the Volkswagen commercial-vehicle documentation. The previous catalogue make label was incorrect; confirm the source vehicle and engine before use.
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 30 Nm (22 lb-ft) | Tighten locking bolt to 30 Nm. |
| 20 Nm (15 lb-ft) | Tighten securing nut (2) to 20 Nm. |
| 15 Nm (11 lb-ft) | Tighten securing bolt to 15 Nm. |
| 160 Nm (118 lb-ft) | Tighten injection pump drive pulley securing nut to 160 Nm. Use counterhold tool3036 for this. [Note: When tightening the securing bolt, ensure that no torque is transmitted to the injection pump shaft, which is locked at commencement of injection.] |
| 12 Nm (8.9 lb-ft) | Insert intermediate plate (1) and tighten locking bolt to 12 Nm. |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- Remove noise insulation tray (repair group 50).
- Remove radiator grille 66
- Remove bracket for charge air cooler (1)
- Remove securing bolts (2) on left and right
- Fold lock carrier with radiator out forwards (arrow)
- Remove charge air cooler/intake manifold connecting pipe
- Loosen securing bolt for coolant pipe on starter
- Remove injection pump toothed belt guard
- Turn crankshaft in engine direction of rotation to TDC No. 1 cylinder:
- Marks (arrows) on injection pump pulley/bracket (C) and flywheel/clutch housing (A) or drive plate/clutch housing (B) must align.
- Marks (arrows) on injection pump pulley/bracket (C) and flywheel/clutch housing (A) or drive plate/clutch housing (B) must align. [Note: This condition is only achieved every 2nd TDC position.]
- Set TDC adjustment bar 2068 A to 82 mm (arrow A), left notch of vernier scale is reference point
- Screw in TDC adjustment bar 2068 A as shown; turn crankshaft until TDC mark on flywheel/drive plate aligns with edge of TDC adjustment bar 2068 A(arrow) and marks on injection pump pulley and bracket align [Note: This condition is only achieved every 2nd TDC position.]
- Mark direction of rotation of toothed belt
- Hold injection pump drive pulley with counterhold tool 3036; unscrew securing bolt and remove toothed belt
- Remove toothed belt tensioner
- Screw in adapter 3313 instead of plug.
- Insert dial gauge (measuring range 0...3.0 mm) into adapter with pre-tension of approx. 2.0 mm.
- Check that mark on injection pump pulley and injection pump are aligned (arrows).
- Loosen locking bolt (2) on injection pump.
- Remove underlying intermediate plate (1).
- Set dial gauge to "“0”".
- To ensure the injection pump high-pressure pistons are at BDC, turn injection pump pulley slowly counter to engine direction of rotation (clockwise) using counterhold tool 3036. The dial gauge indicator must remain at "“0”", reset dial gauge to "“0”" after reaching BDC if necessary.
- Turn injection pump pulley slowly in engine direction of rotation (anti-clockwise) until dial gauge indicator shows 0.55 mm stroke using counterhold tool 3036.
- Tighten locking bolt to 30 Nm. — 30 Nm (22 lb-ft)
- Check whether TDC mark on flywheel and reference mark are aligned.
- Fit toothed belt onto injection pump pulley.
- Note direction of rotation with used belts.
- Fit injection pump drive pulley into toothed belt and secure gear on camshaft so that the gear can still turn.
- Check installation position of idler roller:
- Turn idler roller so that indicator aligns with flange contour of cylinder head (arrow).
- Tighten securing nut (2) to 20 Nm. — 20 Nm (15 lb-ft)
- Install belt tensioner (1) so that belt tensioner tab seats in cut-out on bracket (arrow B).
- Tighten securing bolt hand-tight.
- To tension toothed belt, turn belt tensioner anti-clockwise until both indicators are aligned -arrow A.
- Tighten securing bolt to 15 Nm. — 15 Nm (11 lb-ft)
- Tighten injection pump drive pulley securing nut to 160 Nm. Use counterhold tool 3036 for this. [Note: When tightening the securing bolt, ensure that no torque is transmitted to the injection pump shaft, which is locked at commencement of injection.] — 160 Nm (118 lb-ft)
- Loosen locking bolt (2) on injection pump.
- Insert intermediate plate (1) and tighten locking bolt to 12 Nm. — 12 Nm (8.9 lb-ft)
- Remove dial gauge and screw plug into injection pump.
- Turn crankshaft two rotations in engine direction of rotation until crankshaft is set to TDC No. 1 cylinder again.
- Check position of indicators (arrow A). The indicators must align. If the indicators do not align, but the front indicator is located within the underlying sheet metal contour, this is permissible. [Note: If the front indicator lies outside of the underlying sheet metal contour, the tensioning process must be repeated.]
- Install toothed belt guard.
- Install charge air cooler/intake manifold connecting pipe
- Tighten securing bolt for coolant pipe on starter
- Dynamically checking commencement of injection and adjusting if necessary 23
- Install radiator with lock carrier
- Install noise insulation tray (repair group 50).
📐 9 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Removing, installing and tensioning injection pump toothed belt (engine codes AAB, AJA)
- Removing, installing and tensioning injection pump toothed belt (engine codes ACV, AHY, AJT, AUF, AXG, AXL, AYC, AYY)
- Removing and installing toothed belt for high-pressure pump (engine codes BKS, BUN)
- Removing and installing toothed belt for high-pressure pump (engine codes CARA, CEXA, CEXB)
- Removing and installing toothed belt for high-pressure pump (engine codes CASA, CASB, CASC, CATA)
- Removing and installing toothed belt pulley for coolant pump, engine codes CPTA, CZEA
- Checking needle lift sender G80
- Checking thermal switch and coolant circulation pump or continued coolant circulation pump
- Removing and installing parts of exhaust system
- Checking brake light switch and brake pedal switch
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.