TorqFix

Removing engine: vehicles with engine code letters AVF, AWX — Audi A6 C5 (4B)

Removing engine — vehicles with engine code letters AVF, AWX — Audi A6 C5 (4B). 114 source steps. Check the document conditions against your vehicle.

114 steps 3 engine codes

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A6 C5 (4B)

  • Opens: coolant
  • Special tools named: VAS 6100

Don't miss

  • Note the rules for cleanliness when working on the automatic gearbox multitronic 01J, front-wheel drive37.
  • To prevent damage to the condenser and refrigerant pipes/hoses, ensure that the pipes and hoses are not stretched, kinked or bent.
  • Protect wing panels from damage.
  • A second mechanic is required for removing the lock carrier.
  • Before removing, mark direction of rotation of poly V-belt with chalk or felt-tipped pen. If the belt runs in the opposite direction when it is refitted, this can cause breakage.

🔧 Engine codes recorded for this source

📋 Procedure

  1. Move selector lever to position "“N”" on vehicles with automatic gearbox.
  1. ⚠ On vehicles with telematics, activate service mode of telematics control unit before disconnecting battery Radio, telephone, navigation 01. Telematics self-diagnosis. — Obtain code on vehicles with coded radio / radio and navigation system (RNS).
  2. Detach rubber seal from plenum chamber cover in direction of (arrow).
  3. Detach plenum chamber cover (1) to front.
  4. With ignition switched off, disconnect earth wire (arrow) at battery.
  1. ⚠ Hot steam/hot coolant may escape when opening expansion tank; cover filler cap with cloth and open carefully. — Open filler cap on coolant expansion tank.
  2. Pull dipstick (1) out of guide tube.
  3. Unclip cover caps.
  4. Unfasten nuts (arrows) and detach engine cover.
  5. Remove insulation beneath cover.
  6. Re-insert dipstick in guide tube.
  7. Unclip cover caps.
  8. Unscrew bolts (arrows) and remove air cleaner cover.
  9. Unscrew bolts (arrows).
  10. Remove air ducts (1) and (2).
  11. Remove cover (arrow) at power steering fluid reservoir.
  12. Vehicles with auxiliary heater: remove bolts (arrows) securing exhaust pipe for auxiliary/additional heater to noise insulation.
  13. Release fasteners (1 … 5) and and take off front and rear noise insulation.
  14. Unbolt bracket for noise insulation (arrow).
  15. Remove front bumper General body repairs, exterior63.
  16. Remove air cowl in front of charge air cooler (arrows).
  17. Unclip ambient temperature sensor G17 from bracket.
  18. Unscrew bolts (arrows) and move cooling pipe for power steering clear; hydraulic fluid system remains closed.
  19. Place drip tray V.A.G 1306 or drip tray VAS 6208 under engine.
  20. Turn drain plug (arrow) on radiator anticlockwise and drain coolant (attach hose to connection if necessary).
  21. Pull off retaining clip for coolant hose (bottom) (arrow) and remove coolant hose from radiator.
  22. Detach air intake hose going to charge air cooler at lock carrier (bottom left) (arrow).
  23. Detach turbocharger air intake hose at lock carrier (bottom right). [Note: Note the rules for cleanliness when working on the automatic gearbox multitronic 01J, front-wheel drive37.]
  1. Place used oil collection and extraction unit V.A.G 1782 under engine.
  2. Disconnect ATF pipes at connection point.
  3. Unbolt bracket for ATF pipe at engine.
  1. Unplug electrical connector (arrow) for headlights on both sides.
  2. Detach cable for bonnet at lock carrier General body repairs, exterior55.
  3. Unplug electrical connectors (1 ... 3) at front of ABS unit.
  4. Move wiring clear.
  5. Detach upper coolant hose (arrow) from radiator.
  6. Remove air ducts at radiator (left and right).
  7. Unplug electrical connector (1) at low pressure switch for air conditioner F73.
  8. Release both retaining pins (2) and pull out to side (arrows).
  1. ⚠ Refrigerant circuit of air conditioner must not be opened. — Detach both brackets (3) and pull condenser upwards out of bracket [Note: To prevent damage to the condenser and refrigerant pipes/hoses, ensure that the pipes and hoses are not stretched, kinked or bent.]
  1. Move condenser to side with pipes/hoses connected and tie onto right front wheel with wire. [Note: Protect wing panels from damage.]
  1. Remove bolts (arrows) at lock carrier (left and right).
  2. Remove engine compartment seal from lock carrier and wing panel flanges.
  3. Unscrew bolts from impact absorbers (arrows) (left and right). [Note: A second mechanic is required for removing the lock carrier.]
  1. Remove lock carrier and place down in a secure position.
  2. Detach coolant hoses and unfasten coolant expansion tank (arrows).
  3. Unplug electrical connector for coolant shortage indicator switch F66 at expansion tank (below).
  1. ⚠ In extreme cases the fuel lines and the fuel can reach a temperature of 100 °C on vehicles with unit injector engine. Allow the fuel to cool down before disconnecting the lines - danger of scalding. Wear protective gloves. Wear safety goggles. — Disconnect fuel return hose (2) and fuel supply hose (1) from fuel filter.
  2. Unplug electrical connector (1).
  3. Unscrew bolt (2).
  4. Remove air pipe (arrows).
  5. Disconnect air intake hose at charge air cooler (arrow).
  6. Place drip tray V.A.G 1306 or drip tray VAS 6208 under engine.
  7. Also disconnect coolant hose at oil cooler (arrow), and drain off remaining coolant.
  8. Disconnect both coolant hoses (leading to heat exchanger) at engine (arrow).
  9. Disconnect coolant hose from connection on thermostat (arrow).
  10. Unplug electrical connector (2) at air mass meter G70.
  11. Move wiring harness going to air cleaner clear (arrows).
  12. Loosen hose clip (3) to remove air intake hose.
  13. Unscrew bolt (1) and remove air cleaner housing.
  14. Unbolt retainer plate for exhaust gas recirculation valve N18 and variable intake manifold flap change-over valve N239 from longitudinal member (right-side) (arrows).
  15. Move wiring at longitudinal member clear.
  16. Disconnect vacuum hose going to brake servo at bulkhead (arrow).
  17. Unscrew bolts (arrows) and take off cover for electronics box in plenum chamber.
  18. Pry off retainer bar with a screwdriver (arrow).
  19. Release retainer catches (arrows) and unplug connectors (1) and (2) from engine control unit.
  20. Release retainer (arrow) and pull auxiliary relay carrier in electronics box upwards to remove.
  21. Pull off fuse.
  22. Release fuse carrier at additional relay carrier and pull off from above.
  23. Release electrical contact in chamber 2 with release tool VAS 1978/8 and remove.
  24. Unplug electrical connectors at rear of connector console.
  25. Unscrew earth connection (3) from bulkhead.
  26. Detach electrical connectors (1) and (2) from retainer at left of bulkhead.
  27. Disengage engine wiring harness at electronics box and bulkhead (arrow) and move clear.
  28. Unplug electrical connector at speedometer sender G22 at left of gearbox.
  29. On vehicles with manual gearbox unplug electrical connector at reversing light switch F4 on gearbox.
  30. Move wiring clear. [Note: Before removing, mark direction of rotation of poly V-belt with chalk or felt-tipped pen. If the belt runs in the opposite direction when it is refitted, this can cause breakage.]
  1. Turn tensioner in direction of (arrow) to slacken poly V-belt.
  2. Remove poly V-belt from alternator pulley.
  3. Counterhold pulley with drift to unbolt power steering pump pulley.
  4. Unbolt power steering pump (arrows) and tie up to one side; the hoses/pipes remain connected.
  5. Unbolt cable clamp for positive wire to starter on engine at right underneath exhaust manifold.
  6. Unbolt nuts securing turbocharger to catalytic converter (arrows).
  7. Loosen nuts on clamp (arrows).
  8. Push the clamp back in order to separate the exhaust system. [Note: Do not bend the flexible joint (de-coupling element) in the exhaust system more than 10°, otherwise it could be damaged.]
  1. Disconnect catalytic converter with exhaust pipe from turbocharger. [Note: Before removing, mark direction of rotation of poly V-belt with chalk or felt-tipped pen. If the belt runs in the opposite direction when it is refitted, this can cause breakage.]
  1. Loosen securing bolts of tensioning roller for air conditioner compressor poly V-belt (arrows).
  2. Remove poly V-belt.
  1. ⚠ Refrigerant circuit of air conditioner must not be opened. — Unbolt air conditioner compressor from bracket.
  2. Tie up air conditioner compressor and condenser to right side of vehicle, with hoses/pipes connected.
  3. Unscrew earth wire at engine support (right-side) (arrow).
  4. Detach electrical wires (1) and (2) at starter.
  5. Unscrew clamp (3).
  6. Unbolt starter from gearbox and remove.
  7. Mark positions of bolt connections (1) and locating sleeves (2) on bottom of engine mountings (left and right). [Note: Different mounting holes are provided for the different engine versions.]
  1. Loosen nuts (1) at bottom of engine mountings (left and right) several turns.
  2. Unscrew engine/gearbox securing bolts (accessible from below) (arrows). [Note: If the bolts will not unscrew:Lift engine and gearbox by applying workshop hoist V.A.G 1202 A or VAS 6100 at bracket for torque reaction support. Make sure no wires/pipes are damaged at the top on the bulkhead.]
  1. ⚠ To avoid injury, ensure adequate support. — Lower the engine back down.
  2. Unscrew the top nuts from both engine mountings (arrow).
  3. Unscrew top engine/gearbox securing bolts. Leave one bolt in place (finger-tight).
  4. Pull off engine compartment seals in area of suspension turrets.
  5. Set up support bracket10-222 A behind gas-filled strut on suspension turrets. The spindle must be at the front.
  6. Insert gearbox support 3147 into bolt hole in gearbox bell housing.
  7. Connect the gearbox support 3147 and support bracket10-222 A using hooks10-222 A/2. [Note: Illustration shows engine removed.]
  1. Remove toothed belt cover (top) (arrows).
  2. Remove bolts (3) and take off cover panel (2).
  3. Move charge pressure control solenoid valve N75(Item 1) clear to one side with lines connected.
  4. Bolt retainer T10014 onto front of engine.
  5. Clear away any components from rear left engine lifting eye and fit shackle10-222 A/12.
  6. Hook lifting tackle 2024 A with extension 2024 A/1 onto engine and workshop hoist V.A.G 1202 A or VAS 6100. [Note: To adjust to the centre of gravity for the assembly, the perforated rails of support hooks must be positioned as shown.]
  1. ⚠ The hook attachments and locating pins on the lifting tackle must be secured with locking pins (arrows in illustration). — Unscrew remaining securing bolt for engine/gearbox assembly. [Note: Check that all hoses and other connections between engine and body have been detached.]
  1. Lift engine until studs are clear of engine mountings.
  2. Tension spindles of support bracket10-222 A again. [Note: Make sure no wires/pipes are damaged at the top on the bulkhead.]
  1. Detach engine from gearbox and lift engine forwards out of engine compartment.

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.