Removing and installing top section of intake manifold: Audi A8 D2 (4D) (AZC)
Removing and installing top section of intake manifold — Audi A8 D2 (4D) (AZC). 13 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi A8 D2 (4D)
Don't miss
- Bolts (1) and (3) do not have to be loosened.
- Bolts (2) and (4) do not have to be loosened.
- Seal intake ports on cylinder heads with clean cloths.
🔧 Engine codes recorded for this source
📋 Procedure
- Remove cover behind intake manifold (arrows).
- Remove cover (left-side) in engine compartment (arrows).
- Remove air hose (left-side) (arrows).
- Detach vacuum hose (arrow) to brake servo on left section of intake manifold.
- Detach electrical connector (4).
- Unscrew bolts (2) and detach bracket for electrical connectors. The electrical connectors remain attached to bracket. [Note: Bolts (1) and (3) do not have to be loosened.]
- Remove cover (right-side) in engine compartment (arrows).
- Remove air hose (right-side) (arrows).
- Detach electrical connector (1).
- Unscrew bolts (3) and detach bracket for electrical connectors. The electrical connectors remain attached to bracket. [Note: Bolts (2) and (4) do not have to be loosened.]
- Disconnect vacuum hoses (1) and (4).
- Remove pipe connection from intake manifold by unscrewing bolts (2) and (3).
- Remove top section of intake manifold by unscrewing bolts (1) and (2) [Note: Seal intake ports on cylinder heads with clean cloths.]
📐 10 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other AUDI procedures
- Intake manifold (top section) - exploded view
- Removing and installing intake manifold (top section) – Audi
- Exploded view - intake manifold (bottom section), fuel rail and injectors
- Exploded view - intake manifold (bottom section) with fuel rail
- Intake manifold (bottom section) - exploded view
- Intake manifold (bottom section), fuel rail and injectors - exploded view
- Checking lambda control and lambda probes; operations for cylinders 1 to 6
- Checking lambda control and lambda probes; operations for cylinders 7 to 12
- Draining
- Checking the data exchange between the engine control units and other CAN-capable control units
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.