Removing and installing refrigerant lines with internal heat exchanger: Audi Q5 hybrid — Audi
Removing and installing refrigerant lines with internal heat exchanger — Audi Q5 hybrid — Audi. Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi A5 (8T, 2007–2016), Audi Q5 (8R, 2008–2017), Audi A5 Cabriolet (8F), Audi A4 B8 (8K, 2007–2015)
- Opens: refrigerant (A/C)
- Special tools named: VAS 5051
- Replacement notes from the steps (read the conditions below): Renew quick-release couplings at refrigerant line with internal heat exchanger . Renew O-rings (A) and (C); for correct version, refer to Electronic parts catalogue. [Note: Observe fitting instructions for O-rings .]
- Also covered elsewhere: Electronic parts catalogue
Don't miss
- Use e.g. clean sealing plugs (B) (size 20) from engine bung setVAS 6122 for covering connections at JX1(A)
- Seal open lines and connections at refrigerant line with suitable caps (to prevent ingress of dirt and moisture).
- Disregard (item 1).
- Seal open connections at refrigerant line and expansion valve with suitable caps (to prevent ingress of dirt and moisture).
- Observe fitting instructions for O-rings .
📋 Procedure
- Switch off ignition.
- Discharge refrigerant circuit Air conditioner with refrigerant R134a 87. Refrigerant circuit (Air conditioner with refrigerant R134a; Refrigerant circuit; Working with the air conditioner service station). [Note: Depending on the position of the service connection at the refrigerant line and the vehicle version, it may be necessary to remove the additional reinforcement for the body brace (left-side) to make it possible to connect the service coupling of the air conditioner service station (e.g. on the Audi Q5) Running gear, axles, steering 40. Suspension strut, upper links; Exploded view - suspension strut, upper links and Air conditioner with refrigerant R134a 87. General notes on air conditioning systems.] [Note: De-energising high-voltage system:Connect vehicle diagnostic testerSelect Guided Fault Finding modeUsing the Go to key, select the following menu items in successionFunction/component selectionBodyElectrical systemSelf-diagnosis compatible systems8C - Hybrid battery management -J8408C - Hybrid battery management, functions51 - De-energise high-voltage system (Rep. gr. 93)]
- ⚠ High voltage can cause fatal injury. Danger of severe or fatal injuries from electric shock. The high-voltage system may only be de-energised by a suitably qualified person (Audi high-voltage technician). It must be definitely confirmed that the high-voltage system is de-energised. The system may only be de-energised using the vehicle diagnostic tester via "“Guided Fault Finding”". The qualified person (Audi high-voltage technician) confirms that the system is de-energised and uses the locking cap T40262 to ensure that the system cannot be re-energised. The ignition key and the maintenance connector for high-voltage system TW should then be stored in a safe place by the qualified person. The qualified person (Audi high-voltage technician) marks the vehicle by attaching the appropriate warning signs. — Remove rubber seal (A) and plenum chamber cover (B) (different versions) General body repairs, exterior 50. Bulkhead; Removing and installing plenum chamber cover.
- De-energise high-voltage system Electrical system 93. De-energising high-voltage system.
- Detach earth connection from batteryAElectrical system 27. Battery; Disconnecting and connecting battery.
- Remove rubber seal (A) and plenum chamber cover (B) (different versions) General body repairs, exterior 50. Bulkhead; Removing and installing plenum chamber cover.
- Detach earth connection from batteryAElectrical system 27. Battery; Disconnecting and connecting battery.
- Unfasten power distributor (1) and set it down together with wiring towards windscreen Electrical system 97. Relay carriers, fuse carriers, electronics boxes; Overview of fitting locations - relay carriers, fuse carriers, electronics boxes.
- Detach high-voltage wiring to JX1Electrical system 93. High-voltage wires; Overview of fitting locations - high-voltage wires.
- Cover JX1 and corresponding wiring to prevent damage or contamination Electrical system 93. General warning instructions for work on the high-voltage system. [Note: Use e.g. clean sealing plugs (B) (size 20) from engine bung set VAS 6122 for covering connections at JX1(A)] [Note: Should it be necessary in order to be able to remove and install the refrigerant line with internal heat exchanger, remove the cowl panel trim (C)General body repairs, exterior 50. Bulkhead; Removing and installing plenum chamber cover. From model year 2010 onwards, certain vehicle versions are fitted with refrigerant lines with internal heat exchanger (A) with an additional weight (damper) (B) to reduce noise (depending on the engine). When installing the refrigerant lines with internal heat exchanger (A) and the plenum chamber partition panel, make sure that the weight (B) and the refrigerant lines (A) are not too close to or do not make contact with other components.]
- Detach refrigerant line from quick-release couplings (see the separate procedure). [Note: Seal open lines and connections at refrigerant line with suitable caps (to prevent ingress of dirt and moisture).]
- Unfasten plenum chamber partition panel (A) from vehicle General body repairs, exterior 50. Bulkhead; Exploded view - bulkhead. [Note: On vehicles with a petrol engine or 4-cyl. TDI engine, the two coolant hoses to the heat exchanger are routed through the plenum chamber partition panel (A). On these vehicles, detach grommet at both coolant hoses and move partition panel to one side (this avoids having to open the coolant circuit).When unfastening the plenum chamber partition panel, pay attention to the vacuum line to the brake servo to avoid damaging it.]
- Release fasteners (arrows A) and lift off top section of pipe gland (2)(arrow B). [Note: Disregard (item 1).]
- Unfasten wiring harness from bottom section of pipe leadthrough (2) and remove bottom section.
- Unscrew nut (C) at suspension turret.
- Remove bolts (A).
- Detach refrigerant line (B) with internal heat exchanger from expansion valve. [Note: Seal open connections at refrigerant line and expansion valve with suitable caps (to prevent ingress of dirt and moisture).] [Note: For electrical connections and routing, refer to .]
- Thoroughly clean all connections in expansion valve (B) and in refrigerant line (D) with internal heat exchanger.
- Check connections in expansion valve (B) and at refrigerant line (D) for damage.
- Renew quick-release couplings at refrigerant line with internal heat exchanger (see the separate procedure).
- Renew O-rings (A) and (C); for correct version, refer to Electronic parts catalogue. [Note: Observe fitting instructions for O-rings .]
- Lubricate O-rings lightly with refrigerant oil before installing (see the separate procedure).
- Make sure that O-rings are correctly positioned in grooves of refrigerant line connections at refrigerant line (D).
- Tighten bolts (E) for refrigerant line (D) with internal heat exchanger.
- Tighten nut (C) for refrigerant line (B).
- Install plenum chamber partition panel General body repairs, exterior 50. Bulkhead; Exploded view - bulkhead. [Note: Take care not to strain refrigerant line during installation. Check installation position of refrigerant line to expansion valve (it must not make contact with other components).]
- Attach refrigerant line to quick-release couplings (see the separate procedure).
- Re-install remaining components (removed earlier).
- Evacuate and charge refrigerant circuit Air conditioner with refrigerant R134a 87. Refrigerant circuit (Air conditioner with refrigerant R134a; Refrigerant circuit; Working with the air conditioner service station).
- For electrical connections and routing, refer to (see the separate procedure).
- Re-energise power supply of high-voltage system Electrical system 93. De-energising high-voltage system. [Note: Re-energising high-voltage system:Connect vehicle diagnostic testerSelect Guided Fault Finding modeUsing the Go to key, select the following menu items in successionFunction/component selectionBodyElectrical systemSelf-diagnosis compatible systems8C - Hybrid battery management -J8408C - Hybrid battery management, functions51 - Re-energise high-voltage system (Rep. gr. 93)]
- ⚠ High voltage can cause fatal injury. Danger of severe or fatal injuries from electric shock. The high-voltage system may only be re-energised by a suitably qualified person (Audi high-voltage technician). The system may only be re-energised using the vehicle diagnostic tester via "“Guided Fault Finding”". The vehicle is then made ready for operation again by the qualified person (Audi high-voltage technician).The qualified person (Audi high-voltage technician) marks the vehicle by attaching the appropriate warning signs. — Switch on ignition.
- Interrogate event memory of operating and display unit (Climatronic control unit J255) and erase any faults displayed Vehicle diagnostic, testing and information system VAS 5051 ("Guided Fault Finding").
- Start up air conditioner after charging refrigerant circuit (see the separate procedure). [Note: Also observe notes on starting up air conditioner after charging Air conditioner with refrigerant R134a 87. General notes on air conditioning systems (before using air conditioner after system has been re-charged).]
📐 6 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other AUDI procedures
- Removing and installing refrigerant lines with internal heat exchanger - all vehicles except RS models and Audi Q5 hybrid
- Exploded view - refrigerant lines, expansion valve, internal heat exchanger
- Removing and installing refrigerant lines with internal heat exchanger
- Removing and installing refrigerant lines with internal heat exchanger - RS models
- Removing and installing refrigerant line with internal heat exchanger
- Removing and installing internal heat exchanger – Audi
- Removing and installing toothed belt – Audi
- Removing engine – Audi A8 D3
- Removing camshaft timing chain from camshafts – Audi A6/A7 C7
- Installing engine – Audi A8 D4
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.