TorqFix

Removing and installing internal heat exchanger: Audi A6/A7 C7 (4G)

Removing and installing internal heat exchanger — Audi A6/A7 C7 (4G). 21 source steps. Check the document conditions against your vehicle.

21 steps

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A6/A7 C7 (4G, 2011–2018)

  • Opens: refrigerant (A/C)
  • Replacement notes from the steps (read the conditions below): Renew O-rings; for correct version, refer to Electronic parts catalogue.
  • Also covered elsewhere: Electronic parts catalogue

Don't miss

  • On vehicles in which the coolant hose is routed through the plenum chamber partition panel it is only necessary to unfasten the plenum chamber partition panel.

📋 Procedure

  1. Discharge refrigerant circuit Air conditioner with refrigerant R134a 87. Refrigerant circuit.
  2. Remove plenum chamber partition panel General body repairs, exterior 50. Bulkhead; Removing and installing plenum chamber partition panel. [Note: On vehicles in which the coolant hose is routed through the plenum chamber partition panel it is only necessary to unfasten the plenum chamber partition panel.]
  1. Release fasteners (arrows A) and lift off pipe leadthrough (1)(arrow B).
  2. Detach refrigerant lines from internal heat exchanger (see the separate procedure).
  1. Move internal heat exchanger (1) clear at bracket; to do so, release clip (5)(arrow) and open.
  2. Remove bolts (3 and 4).
  3. Detach refrigerant line (2) with internal heat exchanger from expansion valve.
  4. Seal off open lines and connections with clean plugs from engine bung set VAS 6122.
  5. Take out refrigerant line (1) with internal heat exchanger towards front, as shown.
  6. Vehicles in which coolant hose is routed through plenum chamber partition panel: Push plenum chamber partition panel (2) towards engine.
  7. Guide refrigerant line with internal heat exchanger through underneath brake servo (3) (twist line while guiding through).
  1. Renew O-rings; for correct version, refer to Electronic parts catalogue.
  2. Clean connections at expansion valve (B) and at internal heat exchanger (D) and check for damage.
  3. Thoroughly clean connection area of refrigerant lines and check for damage.
  4. Insert O-rings (A and C) in groove on connection of internal heat exchanger. [Note: Coat O-rings with refrigerant oil before fitting .Make sure O-rings are seated correctly in groove (arrow) of corresponding refrigerant line. After attaching, check routing of refrigerant lines. They must be inserted in brackets provided and should not make contact with other components.]
  1. Insert internal heat exchanger at expansion valve.
  2. Tighten bolts (E).
  3. Attach refrigerant lines to internal heat exchanger (see the separate procedure).
  1. Evacuate and charge refrigerant circuit Air conditioner with refrigerant R134a 87. Refrigerant circuit.
  2. Start up air conditioner after charging refrigerant circuit and Air conditioner with refrigerant R134a 87. General information on air conditioner.
  3. As a final step, interrogate event memory and erase any entries displayed ("“Guided Fault Finding”").

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.