TorqFix

Removing and installing exhaust manifold (right-side) with catalytic converter: Audi A8 D3 (4E) (BVJ)

Removing and installing exhaust manifold (right-side) with catalytic converter — Audi A8 D3 (4E)… Read available instructions and vehicle application notes.

46 steps 1 engine code Showing one source document; this title group contains 4 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A8 D3 (4E, 2002–2010)

  • Opens: coolant
  • Special tools named: T40093/6
  • Replacement notes from the steps (read the conditions below): Unscrew bolt (2) and remove exhaust manifold (right-side) with catalytic converter (accessible from below) towards front. [Note: Disregard (item 1).] [Note: Renew gasket and self-locking nuts.] Fit new gasket onto studs.

Don't miss

  • Disregard (items 3 and 4).
  • Disregard (items 1 and 2).
  • Disregard (item 1).
  • The mounting strips (bottom) remain installed.

🔧 Engine codes recorded for this source

BVJ

📋 Procedure

  1. ⚠ To prevent irreparable damage to the electronic components when disconnecting the battery:Observe notes on procedure for disconnecting the battery. — With ignition switched off, disconnect earth cable at battery Electrical system27.
  2. Pull off engine cover panel (rear).
  3. Drain off coolant (see the separate procedure).
  4. Remove coolant pipe (right-side) (see the separate procedure).
  5. Remove poly V-belt (see the separate procedure).
  6. Remove alternator Electrical system27
  7. Remove front silencer (right-side) (see the separate procedure).
  8. Detach electrical connectors from bracket and unplug connectors:
  1. Move electrical wiring to Lambda probes clear. [Note: Disregard (items 3 and 4).]
  1. Remove bolt (arrow) on mounting for torque reaction support.
  2. Remove bolts (arrows).
  3. Pull off rubber seal (1) and remove plenum chamber covers (2 and 3).
  4. Unscrew rear bolts (3) for body brace.
  5. Attach adapters10 - 222 A /21 without adapter10 - 222 A /4 onto suspension turrets.
  1. Attach adapter10 - 222 A /4 using adapters T40093/6 to adapters 10 - 222 A /21.
  2. Secure spindles 10 - 222 A /11 to engine lifting eyes.
  3. Take up weight of engine using spindles of support bracket.
  4. Remove bolts (left and right) (1 and 2) for anti-roll bar mountings.
  5. Remove bolts (3 and 4). [Note: Disregard (items 1 and 2).]
  1. Remove bolts for engine mountings (arrows) on both sides.
  2. Take out engine cross member.
  3. Unplug electrical connector (2) at vehicle level sender (left and right). [Note: Disregard (item 1).]
  1. Turn spindles 10 - 222 A /11 to lower engine/gearbox assembly as far as dimension (a).
  1. Take out mounting for torque reaction support.
  2. Remove bolts (2 ... 5).
  3. Remove torque reaction support. [Note: Disregard (item 1).]
  1. Unplug electrical connector (2) at engine mounting (right-side).
  2. Unbolt bracket for wiring from engine support (right-side) (1).
  3. Remove bolts (arrows) and detach engine support with engine mounting.
  4. Place drip tray for workshop hoist VAS 6208 under engine.
  5. Disconnect coolant hose (right-side) (arrow) and drain off coolant.
  6. Unscrew nuts (6 ... 1). [Note: The mounting strips (bottom) remain installed.]
  1. Unscrew bolt (2) and remove exhaust manifold (right-side) with catalytic converter (accessible from below) towards front. [Note: Disregard (item 1).] [Note: Renew gasket and self-locking nuts.]
  1. Fit new gasket onto studs.
  2. Fit exhaust manifold in mounting strips and tighten (see the separate procedure).
  3. Install torque reaction support and mounting for torque reaction support (see the separate procedure).
  4. Install front silencer (right-side) (see the separate procedure).
  5. Install engine support with engine mounting (see the separate procedure).
  6. Install alternator Electrical system27
  7. Install poly V-belt (see the separate procedure).
  8. Install subframe and engine cross member (repair group 40).
  9. Install anti-roll bar (repair group 40).
  10. Install coolant pipe (right-side) (see the separate procedure).
  11. Align exhaust system so it is free of stress (see the separate procedure).
  12. Observe notes on procedures required after connecting battery Electrical system27.
  13. Fill cooling system (see the separate procedure).

📐 16 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 16 workshop diagrams for this job Ask about your Audi BVJ — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.