TorqFix

Removing and installing exhaust gas recirculation control motor V338: Audi Q7 (4L) (BUN, BUG, CASA, CASB)

Removing and installing exhaust gas recirculation control motor V338 — Audi Q7 (4L) (BUN, BUG… Read available instructions and vehicle application notes.

14 steps 4 engine codes Showing one source document; this title group contains 21 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi Q7 (4L, 2005–2015)

  • Opens: coolant
  • Replacement notes from the steps (read the conditions below): Remove bolts (1, 2, 3), detach exhaust gas recirculation control motorV338 and detach from coolant hose (4). [Note: Renew seals and gaskets.]

Don't miss

  • Disregard (arrow) on right-side of illustration.
  • Disregard (item 1).
  • Renew seals and gaskets.

🔧 Engine codes recorded for this source

📋 Procedure

  1. Drain coolant (see the separate procedure).
  2. Carefully pull engine cover panel off four retaining pins one after the other (arrows).
  3. Unscrew bolt (left arrow) and remove retaining clip.
  4. Unscrew union nuts (1 ... 4) and detach high-pressure pipes. [Note: Disregard (arrow) on right-side of illustration.]
  1. Remove intake manifold (top section) (repair group 23).
  2. Remove oil filter housing (see the separate procedure).
  3. Pull out retaining clip and detach connection (arrow) with thermostat for exhaust gas recirculation.
  4. Detach electrical connector (2) for exhaust gas recirculation temperature sensor G98 from bracket and unplug. [Note: Disregard (item 1).]
  1. Unplug electrical connector (arrow) for exhaust gas recirculation control motor V338.
  2. Remove bolts (1, 2, 3), detach exhaust gas recirculation control motor V338 and detach from coolant hose (4). [Note: Renew seals and gaskets.]
  1. Install oil filter housing (see the separate procedure).
  2. Install intake manifold (top section) (repair group 23).
  3. Install high-pressure pipes (repair group 23).
  4. Fill up with coolant (see the separate procedure).

📐 4 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 4 workshop diagrams for this job Ask about your Audi BUN — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.