TorqFix

Removing and installing engine oil cooler: Audi TT Mk2 (8J) (CDLA, CDLB, CDMA)

Removing and installing engine oil cooler — Audi TT Mk2 (8J) (CDLA, CDLB, CDMA). 23 source steps. Check the document conditions against your vehicle.

23 steps 3 engine codes Showing one source document; this title group contains 100 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi TT Mk2 (8J, 2006–2014)

  • Opens: coolant

Don't miss

  • Disregard item (3).

🔧 Engine codes recorded for this source

📋 Procedure

  1. Drain coolant (see the separate procedure).
  2. Remove radiator cowl (see the separate procedure).
  3. Remove noise insulation frame (arrow) (General body repairs, exterior 50. Lock carrier; Exploded view - lock carrier) with rear noise insulation (General body repairs, exterior 66. Noise insulation; Exploded view - noise insulation).
  4. Unplug electrical connector (3).
  5. Remove bolt (arrow).
  6. Detach hose (2).
  7. Loosen hose clip (1), pull turbocharger air recirculation valve N249 off air pipe and move clear (hose (4) remains connected).
  8. Unplug electrical connector (arrow) at charge pressure sender G31.
  9. Remove bolt (1) and nut (4).
  10. Loosen hose clip (2) and detach air pipe. [Note: Disregard item (3).]
  1. Release hose clip (1) and detach air hose.
  2. Unplug electrical connector (2) for air mass meter G70.
  3. Unscrew top section of air cleaner housing (arrow) and remove air filter element.
  4. Remove bolts (arrows) and detach bottom section of air cleaner housing.
  5. Use assembly tool T10118 to release electrical connector (arrow) at oil pressure switch F1 and unplug.
  6. Place drip tray for workshop hoist VAS 6208 beneath engine.
  7. Detach coolant hose (1).
  8. Unscrew bolts (arrows) and remove oil cooler. [Note: Renew seals and gaskets. Hose connections and air pipes and hoses must be free of oil and grease before assembly. Secure all hose connections with the correct type of hose clips (same as original equipment) Electronic parts catalogue. To ensure that the charge air hoses can be properly secured at their connections, spray rust remover onto the worm thread of used hose clips before installing.]
  1. Install air pipe (see the separate procedure).
  2. Install air cleaner housing and air filter element 24Air cleaner; Removing and installing air cleaner housing.
  3. Install noise insulation frame General body repairs, exterior 50. Lock carrier; Exploded view - lock carrier.
  4. Install radiator cowl (see the separate procedure).
  5. Fill up with coolant (see the separate procedure).

📐 6 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 6 workshop diagrams for this job Ask about your Audi CDLA — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.