Removing and installing coolant pipe (in centre tunnel, centre): Audi R8 (4S) (CSPA, CSPB)
Removing and installing coolant pipe (in centre tunnel, centre) — Audi R8 (4S) (CSPA, CSPB). Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi R8 (4S, 2015–)
- Opens: coolant
- Special tools named: VAS 5014
Don't miss
- Secure all hose connections with correct type of hose clips (as original equipment) Electronic parts catalogue.
- Do not reuse coolant.
📋 Procedure
- Remove front final drive Front final drive 39. Final drive; Removing and installing final drive.
- Remove propshaft 39Propshaft; Removing and installing propshaft.
- Move manual release cable for parking lock clear and press slightly to one side.
- ⚠ Hot steam/hot coolant can escape - risk of scalding. The cooling system is under pressure when the engine is hot. To allow pressure to dissipate, cover filler cap on coolant expansion tank with cloth and open carefully. — Open filler cap (arrow) on coolant expansion tank.
- Unscrew bolts (arrows) and unclip and detach bottom sections (1) of retaining clips in centre tunnel.
- Place collector tank from coolant collecting system VAS 5014 or drip tray for workshop hoist VAS 6208 underneath connection point.
- Lift retaining clip (arrow) and disconnect coolant hose.
- Remove luggage compartment pan General body repairs, interior 70. Luggage compartment trim panels; Overview of fitting locations - luggage compartment trim panels.
- Release hose clip (arrow) and detach coolant hose from heat exchanger.
- Detach coolant pipe (1) from brackets (2) in centre tunnel and remove together with coolant hoses. [Note: Secure all hose connections with correct type of hose clips (as original equipment) Electronic parts catalogue.]
- Install propshaft Final drive 39. Propshaft; Removing and installing propshaft.
- Install front final drive Front final drive 39. Final drive; Removing and installing final drive.
- Fit coolant hoses and hose clips (see the separate procedure).
- Connect coolant hose with plug-in connector (see the separate procedure). [Note: Do not reuse coolant.]
- Fill up with coolant (see the separate procedure).
📐 4 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other AUDI procedures
- Removing and installing coolant pipe (in centre tunnel, right-side)
- Removing and installing coolant pipe (centre right) – Audi
- Removing and installing coolant pipe (front centre) – Audi BTR
- Removing and installing bottom coolant pipe - vehicles with engine code letters AJM
- Removing and installing bottom coolant pipe - vehicles with engine code letters AVF, AWX
- Removing and installing coolant pipe – Audi A3
- Removing and installing engine oil cooler (left-side) – Audi
- Removing and installing combination valve (right-side)
- Checking fuel gauge senders in fuel tank chamber (right-side)
- Checking fuel gauge senders in fuel tank chamber (left-side)
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.