TorqFix

Removing and installing coolant pipe (front centre): Audi A8 D4 (4H) (CDSB, CTEC)

Removing and installing coolant pipe (front centre) — Audi A8 D4 (4H) (CDSB, CTEC). 16 source steps. Check the document conditions against your vehicle.

16 steps 2 engine codes Showing one source document; this title group contains 2 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A8 D4 (4H, 2010–2017)

Don't miss

  • Oil supply lines remain in installation position.

🔧 Engine codes recorded for this source

📋 Procedure

  1. Remove radiator (see the separate procedure).
  2. Remove pump for exhaust gas recirculation cooler V400.
  3. Remove coolant pipe (top front) (see the separate procedure).
  4. Remove air cleaner housing (right-side) (see the separate procedure).
  5. Unplug electrical connector (1).
  6. Release hose clips (2) and (arrows) and remove air hose.
  7. Remove bolt (1) and banjo bolt (2). [Note: Oil supply lines remain in installation position.]
  1. Release hose clip (3) and detach air hose.
  2. Release hose clips (1) and (2) and disconnect coolant hoses.
  3. Remove bolts (1) and (2).
  4. Detach coolant pipe (front centre) from cylinder block and from coolant hoses (open hose clips (arrows)). [Note: Renew seals and O-ring. Hose connections and hoses for charge air system must be free of oil and grease before assembly. Secure all hose connections with the correct type of hose clips (same as original equipment) Electronic parts catalogue. To ensure that the air hoses can be properly secured at their connections, spray rust remover onto the worm thread of used hose clips before installing.]
  1. Install oil supply lines going to turbocharger (see the separate procedure).
  2. Install air cleaner housing (see the separate procedure).
  3. Install coolant pipe (top front) (see the separate procedure).
  4. Install pump for exhaust gas recirculation cooler V400.
  5. Install radiator (see the separate procedure).

📐 4 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 4 workshop diagrams for this job Ask about your Audi CDSB — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.