TorqFix

Removing and installing coolant pipe (bottom left): Audi A8 D3 (4E) (BVJ)

Removing and installing coolant pipe (bottom left) — Audi A8 D3 (4E) (BVJ). 50 source steps. Check the document conditions against your vehicle.

50 steps 1 engine code Showing one source document; this title group contains 16 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A8 D3 (4E, 2002–2010)

  • Opens: coolant
  • Special tools named: T40093/6
  • Replacement notes from the steps (read the conditions below): Remove coolant pipe (bottom left). [Note: Fit new O-ring to guide tube for oil dipstick.Secure all hose connections with the correct type of hose clips (same as original equipment) Electronic parts catalogue.]

Don't miss

  • Disregard (arrows).
  • Nuts (2, 3 and 4) are removed at a later stage.
  • Disregard (item 1).
  • Disregard (arrow) on right-side of illustration.
  • Shown in illustration with engine removed.

🔧 Engine codes recorded for this source

BVJ

📋 Procedure

  1. Drain off coolant (see the separate procedure).
  2. Slacken hose clip (1) on coolant hose. [Note: Disregard (arrows).]
  1. Remove front silencer (left-side) (see the separate procedure).
  2. Unscrew nuts (1 and 5) (accessible from below). [Note: Nuts (2, 3 and 4) are removed at a later stage.]
  1. Detach vacuum lines (arrows) going to brake servo.
  2. Move vacuum lines clear to one side. [Note: Disregard (item 1).]
  1. Pull dipstick (10) out of guide tube.
  2. Remove bolts (2 and 5).
  3. Unplug electrical connectors (1, 3, 4, 6, 8) and move wiring harness clear.
  4. Remove Hall sender (9).
  5. Disconnect crankshaft breather hose (7) by pressing release tabs.
  6. Place wiring harness on top of engine.
  7. Detach front coolant hose (2) from coolant pipe (bottom left). [Note: Disregard (item 1).]
  1. Unscrew nuts (2 … 4) (accessible from above).
  2. Detach heat shield (A) from studs.
  3. Lift off heat shield (B).
  4. Unplug electrical connector at ABS control unit (arrow)45.
  5. Remove bolt (1) and lift out guide tube for oil dipstick.
  6. Unscrew bolts (4 and 5) and swivel hydraulic fluid pipe to one side.
  7. Unscrew bolts (2 and 3) and detach coolant pipe (left-side) from coolant hose (left arrow).
  8. Pivot coolant pipe (left-side) upwards slightly. [Note: Disregard (arrow) on right-side of illustration.]
  1. Pull off rubber seal (1) and remove plenum chamber covers (2 and 3).
  2. Unscrew rear bolts (3) for body brace.
  3. Attach adapters10 - 222 A /21 without adapter10 - 222 A /4 onto suspension turrets.
  1. Attach adapter10 - 222 A /4 using adapters T40093/6 to adapters 10 - 222 A /21.
  2. Secure spindles 10 - 222 A /11 to engine lifting eyes.
  3. Take up weight of engine using spindles of support bracket.
  4. Remove front left wheel.
  5. Unbolt bracket for noise insulation (arrows).
  6. Unbolt heat shield for drive shaft from gearbox (arrows). [Note: Shown in illustration with engine removed.]
  1. Detach drive shaft (left-side) from flange shaft.
  2. Remove bolts (left and right) (1 and 2) for anti-roll bar mountings.
  3. Remove bolts (3 and 4). [Note: Disregard (items 1 and 2).]
  1. Remove bolts for engine mountings (arrows) on both sides.
  2. Take out engine cross member.
  3. Unplug electrical connector (2) at vehicle level sender (left and right). [Note: Disregard (item 1).]
  1. Remove bolts (left and right) (arrows) for front gearbox mounting.
  2. Turn spindles 10 - 222 A /11 to lower subframe by dimension (a).
  1. Detach coolant hose (3), to do so, pull out clip slightly.
  2. Detach coolant hose (4) from coolant pipe (bottom left).
  3. Remove bolts (1 and 2).
  4. Remove coolant pipe (bottom left). [Note: Fit new O-ring to guide tube for oil dipstick. Secure all hose connections with the correct type of hose clips (same as original equipment) Electronic parts catalogue.]
  1. Install subframe and engine cross member (repair group 40).
  2. Install drive shaft (left-side) (repair group 40).
  3. Install anti-roll bar (repair group 40).
  4. Install front silencer (left-side) (see the separate procedure).
  5. Align exhaust system so it is free of stress (see the separate procedure).
  6. Install coolant pipe (left-side) (see the separate procedure).
  7. Install Hall sender (see the separate procedure).
  8. Fill cooling system (see the separate procedure).

📐 18 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 18 workshop diagrams for this job Ask about your Audi BVJ — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.