Engine codes ACV, AJT, AUF, AYC, AYY — VW
Engine codes ACV, AJT, AUF, AYC, AYY — VW. 29 source steps and 5 torque figures. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Don't miss
- Obtain radio unit anti-theft coding first if necessary.
- When installing, just nip all bolts (parts must be just free to move), then tighten stress free
- After installing turbocharger, run engine for about 1 minute at idling speed and do not rev up immediately; this ensures that the turbocharger is supplied with oil.
🔧 Engine codes recorded for this source
This source is from the Volkswagen commercial-vehicle documentation. The previous catalogue make label was incorrect; confirm the source vehicle and engine before use.
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 45 Nm (33 lb-ft) | Coat thread and head contact surface of securing bolt and securing nuts between exhaust manifold and turbocharger with greaseG 000 500 and tighten to 45 Nm |
| 25 Nm (18 lb-ft) | Position manifold on turbocharger and tighten to 25 Nm |
| 30 Nm (22 lb-ft) | Position oil return line with new seal and tighten to 30 Nm |
| 25 Nm (18 lb-ft) | Position oil supply line with new oil seals and tighten cap nut to 25 Nm |
| 25 Nm (18 lb-ft) | Position intake manifold with guard plate and new seal (coating or bead of seal points to intake manifold) and tighten to 25 Nm |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- With ignition switched off, disconnect earth strap from battery. [Note: Obtain radio unit anti-theft coding first if necessary.]
- Remove noise insulation tray (repair group 50).
- Remove front exhaust pipe , removing and installing parts of exhaust system
- Remove radiator grille 66
- Remove bracket for charge air cooler (1)
- Remove securing bolts (2) on left and right
- Fold lock carrier with radiator out forwards (arrow)
- Remove charge air cooler with air hoses
- Pull control line off from charge pressure control valve (blue)
- Pull vacuum hoses off connecting pipe (black), turbocharger (red) and exhaust gas recirculation valve (black)
- Remove connecting hose between connecting pipe and air mass meter
- Remove breather hose (1) between crankcase breather valve and connecting pipe
- Remove connecting pipe (2)
- Remove connecting pipe between exhaust gas recirculation valve and exhaust manifold , Removing and installing parts of exhaust gas recirculation system
- Remove intake manifold with guard plate and exhaust gas recirculation valve
- Unbolt oil supply line (1) and oil return line (2) from turbocharger
- Remove manifold (1)
- Unscrew securing bolt and securing nuts between exhaust manifold and turbocharger
- Lift turbocharger (2) out upwards
- Coat thread and head contact surface of securing bolt and securing nuts between exhaust manifold and turbocharger with greaseG 000 500 and tighten to 45 Nm — 45 Nm (33 lb-ft)
- Position manifold on turbocharger and tighten to 25 Nm — 25 Nm (18 lb-ft)
- Position oil return line with new seal and tighten to 30 Nm — 30 Nm (22 lb-ft)
- Fill turbocharger with engine oil at connection for oil supply line.
- Position oil supply line with new oil seals and tighten cap nut to 25 Nm — 25 Nm (18 lb-ft)
- Position intake manifold with guard plate and new seal (coating or bead of seal points to intake manifold) and tighten to 25 Nm — 25 Nm (18 lb-ft)
- Install connecting pipe between exhaust gas recirculation valve and exhaust manifold , Removing and installing parts of exhaust gas recirculation system [Note: When installing, just nip all bolts (parts must be just free to move), then tighten stress free]
- Connect control line (blue) to charge pressure control valve and secure with clamp-type clip
- Connect vacuum hose (red) to turbocharger and secure with clamp-type clip
- After installing turbocharger, run engine for about 1 minute at idling speed and do not rev up immediately; this ensures that the turbocharger is supplied with oil.
Other VW procedures
- Removing and installing compressor bracket - engine codes ACU, ACV, AET, AEU, AEY, AHY, AJA, AJT, APL, AUF, AVT, AXG, AXL, AYC and AYY
- Removing, installing and tensioning injection pump toothed belt (engine codes ACV, AHY, AJT, AUF, AXG, AXL, AYC, AYY)
- Adjusting differential: Gearbox codes FNT, FLU, GAH
- Adjusting differential: Gearbox codes GEQ, GSE, GEW, GSG
- Adjusting turbocharger vacuum unit (engine codes BZB, CGYA, CDAA, CDAB)
- Adjusting valve timing, engine codes AWY, BMD, BBM – VW 1.2
- Checking modulating piston movement sender and quantity adjuster
- Removing, installing and tensioning camshaft toothed belt (02.95 ▸)
- Connecting fault readerV.A.G 1551 and selecting engine electronics control unit
- Checking exhaust gas recirculation and air mass meter function via final control diagnosis
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.