TorqFix

Adjusting vacuum unit for low-pressure turbocharger: Audi A6/A7 C7 (4G)

Adjusting vacuum unit for low-pressure turbocharger — Audi A6/A7 C7 (4G). 21 source steps. Check the document conditions against your vehicle.

21 steps 12 engine codes

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A6/A7 C7 (4G, 2011–2018)

  • Special tools named: dial gauge

Don't miss

  • Make sure that dial gauge can move freely.
  • The turbocharger testerV.A.G 1397A cannot display values greater than 580 mbar.
  • If too much vacuum is vented, bring pressure back up to 580 mbar and then adjust by venting again.

🔧 Engine codes recorded for this source

📋 Procedure

  1. Remove engine cover panel (see the separate procedure).
  2. Secure universal dial gauge bracketVW 387 using a nut (arrow) on catalytic converter.
  3. Attach dial gauge VAS 6341/1 with flat probe VAS 6341/4 to universal dial gauge bracketVW 387
  4. Align dial gauge so that it is aligned with operating rod of vacuum unit.
  5. Set dial gauge to 20... 25 mm preload.
  6. Connect hand vacuum pump VAS 6213 and pressure control valve VAS 6342 to vacuum unit (arrow) and connection "“II”" of turbocharger tester V.A.G 1397A, as shown in illustration.
  7. Close pressure control valve VAS 6342.
  1. Move adjuster ring on hand vacuum pump VAS 6213 to position for "“vacuum”".
  2. Switch on turbocharger tester V.A.G 1397A and set sliding switch to position "“II”".
  3. Make sure that dial gauge can move freely.
  4. Operate hand vacuum pump VAS 6213 until turbocharger tester V.A.G 1397A indicates the following value: [Note: The turbocharger tester V.A.G 1397A cannot display values greater than 580 mbar.]
  1. Set dial gauge to "“0”".
  2. Note measured value.
  3. Vent vacuum using pressure control valve VAS 6342. [Note: If too much vacuum is vented, bring pressure back up to 580 mbar and then adjust by venting again.]
  1. Vent vacuum using pressure control valve VAS 6342.
  1. If specification is not attained, loosen lock nut (1).
  2. Remove securing clip (3) and detach operating rod (2) from mounting pin.
  3. Lengthen or shorten front part of operating rod by turning it to left/right.
  4. Fit operating rod (2) on mounting pin again.
  5. Repeat test with hand vacuum pump VAS 6213 and dial gauge VAS 6341/1.
  6. If specification is attained, fit securing clip and tighten lock nut.

📐 3 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 3 workshop diagrams for this job Ask about your Audi CLAB — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.