VW CHZC — 1L Engine
1L · 109 hp
Engine overview
Torque figures by job
From the step-by-step procedures for this engine — each figure sits in the step that uses it.
- 20 Nm (15 lb-ft) — Tighten bolts (arrows) to
- 20 Nm (15 lb-ft) — Tighten all bolts of engine support T10483 on cylinder block to
- 35 Nm (26 lb-ft) — Tighten nut (B) of assembly tool T10134 to
- 40 Nm (30 lb-ft) — Tighten nut (B) of assembly tool T10134 to
- 45 Nm (33 lb-ft) — If the specification is not achieved, tighten nut of assembly tool T10134 to
- 30 Nm (22 lb-ft) — Using hexagon on coolant pump, preload coolant pump in clockwise direction to
- 12 Nm (8.9 lb-ft) — Then, tighten securing bolts to
- 5 Nm (3.7 lb-ft) — If the torque limit of »
- 22 Nm (16 lb-ft) — Lubricate taper seal of adapter VAS 6394/3 with clean engine oil and screw into fuel rail…
- 50 Nm (37 lb-ft) — Tighten bolts (1 and 2) initially to
- 7 Nm (5.2 lb-ft) — Tighten bolts in the sequence (A
- 7 Nm (5.2 lb-ft) — Tighten bolts for cap (1) in sequence (A
- 9 Nm (6.6 lb-ft) — Tighten bolts in the sequence (1 … 9) to
Workshop procedures for this engine
Step-by-step procedures from the workshop database, carrying 69 torque figures.
- Removing and installing toothed belt · 31 torque figures
- Removing toothed belt from camshaft – VW Golf VII · 14 torque figures
- Removing engine, Polo – VW CHZB/CHZC · 2 torque figures
- Removing and installing engine support – VW · 3 torque figures
- Checking radial clearance of conrods · 5 torque figures
- Removing and installing valve stem seals (cylinder head installed) · 1 torque figures
- Separating exhaust pipes, silencers · 4 torque figures
- Removing and installing camshaft housing
- Removing and installing fuel tank, hatchback – VW Polo 6C 1.2
- Removing and installing camshaft oil seal, exhaust camshaft, gearbox end · 1 torque figures
- Removing and installing radiator blind control motor V544
- Assembly overview - cylinder block, gearbox end · 3 torque figures
- Removing and installing valve stem seals (cylinder head removed)
- Draining and filling with coolant, Polo – VW CHZB/CHZC
- Removing and installing catalytic converter – VW Polo 6C
- Removing and installing fuel rail · 1 torque figures
- Removing and installing fuel line for auxiliary/supplementary heater
- Aligning exhaust system free of tension · 2 torque figures
- Removing and installing fuel delivery unit/fuel gauge sender, saloon
- Removing and installing water radiator for charge air cooling circuit, Golf, Golf Estate, Golf SV
- Removing and installing oil separator · 1 torque figures
- Removing and installing fuel delivery unit/fuel gauge sender, hatchback
- Removing and installing charge pressure positioner V465 · 1 torque figures
- Removing and installing coolant pipes – VW 2.0
- Removing and installing fuel tank, saloon – VW Polo 6R 1.2
Got a CHZC problem? Ask for free.
Describe the symptoms — TorqFix replies with a diagnosis cited from verified workshop data.
Get free diagnosis →Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
This page combines engine catalogue information with available workshop records. Torque tables and service notes have separate source checks; a source for one field does not verify every specification on the page. Unqualified service quantities, intervals and tool lists are withheld. A source check is not a mechanic’s inspection of your vehicle. Match the model, year and engine variant to the cited document.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 23 Nov 2026.