TorqFix

VAG Transporter 1.9 TDI / 2.0 8V Injector R&I (BRR/BRS) — VW

VAG Transporter 1.9 TDI / 2.0 8V Injector R&I (BRR/BRS) — VW. 53 source steps. Check the document conditions against your vehicle.

53 steps 2 engine codes

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A3 (8V, 2012–2020)

  • Special tools named: dial gauge, puller
  • Replacement notes from the steps (read the conditions below): Note: Always renew the injector locking nut, adjustment screws and ball studs Renew the heat shield Note: Use new bolts

Don't miss

  • Always renew the injector locking nut, adjustment screws and ball studs
  • The injectors must be refitted to the same cylinder
  • The injector must be able to turn slightly

🔧 Engine codes recorded for this source

📋 Procedure

Preparation and removal

  1. Note: Always renew the injector locking nut, adjustment screws and ball studs
  2. Dial gauge holder:
  3. Turn the crankshaft clockwise
  4. Disconnect the battery
  5. Puller:
  6. Remove the EGR pipe
  7. Turn the adjustment screw
  8. Disconnect the crankcase breather hose
  9. Note: The injector will be at its limiting stop
  10. Back off the adjustment screw
  11. Turn the crankshaft until the camshaft lobes point fully upwards
  12. Note: On the cylinder which the injector will be removed from
  13. Loosen the locking nuts and fully unscrew the rocker adjustment screws
  14. Remove the bolt
  15. Remove the tensioning block

Installation and checks

  1. Fit the O-ring
  2. Remove the special tool
  3. Fit the special tool:
  4. Fit the O-ring
  5. Renew the heat shield
  6. Injector fitment:
  7. Use a screwdriver
  8. Note: The injectors must be refitted to the same cylinder
  9. Refit the fuel injector
  10. Use the special tool
  11. Fit the tensioning block
  12. Note: Use new bolts
  13. Note: Fit the bolt(s) finger-tight only
  14. The injector must be able to turn slightly
  15. The injector should be aligned at 90° to the camshaft bearing and tensioning block
  16. Align the injectors
  17. Measure the clearance:
  18. Cylinder No.
  19. Tighten the injector bolts
  20. In several stages
  21. Stage 1:
  22. Stage 2:
  23. Fit the new injector ball studs
  24. Fit the new injector adjustment screws and locking nuts
  25. Note: Lubricate the contact surfaces before fitting
  26. Fit the rocker arm shaft
  27. Note: Use new bolts
  28. Tighten the bolts
  29. Stage 1:
  30. Finger-tight only
  31. Stage 2:
  32. Stage 3:
  33. Set the injector initial setting
  34. Refit the cylinder head cover
  35. Renew the gasket if necessary
  36. Apply sealant as indicated
  37. Maximum thickness:
  38. Further refitting is in the reverse order of removal

📐 16 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 16 workshop diagrams for this job Ask about your VW BRR — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.