Renewing front roof reinforcement: VW
Renewing front roof reinforcement — VW. Original source text. Read the instructions and application notes; confirm the exact vehicle before use.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
📋 Procedure
ℹ️ Torque figures below come verbatim from workshop data — always cross-check against your vehicle's factory manual before final tightening.
Renewing front roof reinforcement
Note
The front roof reinforcement is supplied primed and must be painted in the body colour.
It is important to note the modified paintwork structure (see
Paint Workshop Manual
), in order to avoid damage due to corrosion.
In the following description, certain holes have to be drilled in the front roof reinforcement.
If possible, the front roof reinforcement should be painted in the corresponding body colour after drilling the holes. The drilled holes are therefore also protected against corrosion.
Cutting threads and drilling additional holes
Place painted front roof reinforcement on clean surface/work plate where it is protected against being scratched.
Deburr centring pin (1) of front roof reinforcement.
Cut M8 thread (2) for securing front roof reinforcement.
On vehicles with roof aerial, drill hole (3)
, secure roof aerial (6)
, and route wiring harnesses.
On California Beach vehicles, drill holes (4) for manual roof locking mechanism on both sides, and drill another hole for additional
12 V socket
U5
. Rivet bracket for manual roof locking mechanism using pop rivet pliers
VAS 5072A.
Holes for roof locking mechanism = 3,4 mm in diameter
Holes for roof locking mechanism = 13 mm in diameter
Hole for
12 V socket
U5
= (28 mm in diameter)
On California Beach vehicles,
12 V socket
U5 (5) must be inserted into front roof reinforcement and secured there.
Insert nuts (7) for canopy bracket into relevant mountings on front roof reinforcement (arrow)
, and fix them in position using adhesive
AMV 195 KD1 01
. Screw additional bolts into nuts from rear.
Note
The bolts are used to locate the nuts (7) and will be removed after installing the front roof reinforcement.
The nuts (7) must be installed under all circumstances, even if there is no canopy fitted in the vehicle. Not installing these nuts means making any canopy retrofitting at a future point impossible.
When using a new convertible roof actuation hydraulic pump
V118 or roof hydraulics control unit
J768
, cutting threads is not necessary. The securing bolts for these components are self-locking.
When drilling holes in a new part, ensure that all dimensions correspond to those of the old part. If necessary, make drilling templates.
Fitting seals and installing press nuts
Using special tool (2)
, bond in place front seal (2) (which is self-adhesive). Make sure that the seal is bonded in a straight line.
Seal nuts of canopy bracket with adhesive sealant
D 511 500 A2 (6) before inserting the side seal (3).
Insert side seal (3) into front roof reinforcement. When doing so, fix it in position with adhesive
AMV 195 KD1 01 at points indicated by (arrows).
Note
New seals are supplied in excess length and must therefore be shortened/cut to appropriate length depending on individual requirements.
Prime bonding surface of press nuts (4) with glass/paint primer
D 009 200 02
. Observe flash-off period of at least 10 minutes.
Start press nuts (4) by means of bolt (5)
. Tighten bolt (5) to specified torque of 12 Nm so that press nut is pressed into front roof reinforcement.
After press nuts have been pressed in, they must be bonded/fixed in place all round using
2-component polyurethane adhesive
D 180 KD2 A1.
After the
2-component polyurethane adhesive has cured, unscrew bolt (5).
Installing beading strips for bellows
Prime bonding groove of beading strips (1) and mounting edge (2) with glass/paint primer
D 009 200 02
. Observe flash-off period of at least 10 minutes.
Apply adhesive sealant
D 511 500 A2 all round in a bead (4) next to mounting edge (2).
Apply
2-component polyurethane adhesive
D 180 KD2 A1 in bonding groove of beading strips (1) using hand cartridge gun
VAS 5155 (3)
. Fit beading strips onto mounting edge (2)
, and apply light blows with a plastic hammer to allow the beading strips to settle completely.
At positions marked with (arrows)
, beading strips (1) are fixed in position by means of commercially available screw clamps
. Observe flash-off period of the
2-component adhesive.
After installing beading strips (1)
, smooth the adhesive sealant bead (4) all round with an appropriate, commercially available smoothing tool
. If necessary, apply more adhesive sealant.
Fitting protective film and upper seal
Insert gutter grommet (3) into front roof reinforcement on both sides.
Use wooden rail (2) (14 mm) to ensure seal (1) is bonded evenly as per dimension a.
Dimension a
= 14 mm
Note
Before bonding, clean bonding surface of seal (1) with cleaning solution
D 009 401 04.
New seals are supplied in excess length and must therefore be shortened/cut to appropriate length depending on individual requirements.
Make sure that the seal (1) is aligned flush with the gutter grommets (3).
On California Beach vehicles, openings for hydraulic lines in the gutter grommets (3) are sealed with plugs
Electronic Parts Catalogue.
Firmly press on seal (1) using roller
T10314.
Affix additional protective film (self-adhesive, qty. 2)
7H0.853.405 (4) to front roof reinforcement. Make sure the film is affixed without creases. Cut protective film diagonally at ends to adapt its shape to that of the front roof reinforcement. The protective films may overlap in the middle.
Removing hydraulic components from old part and preparing them for reinstallation
Note
If the hydraulic cylinders have not yet been disconnected from the hydraulic lines (see chapter on the removal of front left and front right hinges for pop-up roof
), disconnect them now.
Disconnect hydraulic lines (2) together with old gutter grommet (1) from old part.
Remove old gutter (3) from old gutter grommet (1).
Cut back old gutter grommet (1) until only plastic bush (4) remains.
Note
The plastic bush (4) is bonded to hydraulic lines (2)
. The bonded joint determines the correct installation length of the hydraulic lines relative to the hydraulic cylinders.
The bonded joint between the hydraulic lines (2) and the plastic bush (4) must not be separated, broken or damaged.
During the entire procedure of converting the hydraulic components, it is essential to observe rules for cleanliness and to ensure that the hydraulic lines are not damaged when being installed (2).
Converting hydraulic components
Remove
convertible roof actuation hydraulic pump
V118 (2) and roof hydraulics control unit
J768 (3) from old part, and install them to new part.
The hydraulic lines (1) must be routed and secured in exactly the same way and at exact same positions as they were routed and secured when the old component was used.
On both sides, insert hydraulic lines with permanently bonded plastic bush (4) into new gutter grommets (5).
Removal scenario with hydraulic lines connected
Clip roof hydraulics sender 1
G491 and roof hydraulics sender 4
G494 back onto hydraulic cylinders.
Insert hydraulic lines back into hydraulic cylinders using new seals, and secure hydraulic lines with of securing clips.
Secure hydraulic cylinders to front roof reinforcement making sure not to damage paintwork.
Removal scenario with hydraulic lines disconnected
Carefully secure wiring harnesses and hydraulic lines to front roof reinforcement.
Continuation for both scenarios
Note
When performing any work in which hydraulic lines and hydraulic cylinders are involved, ensure in particular that these components do not become kinked or damaged.
Damaged hydraulic lines must always be renewed to ensure proper function of the pop-up roof.
Apply several spots of adhesive
AMV 195 KD1 01 to additionally secure gutter grommets (5).
Also use adhesive
AMV 195 KD1 01 to secure new water drain hoses (6) to union of gutter grommet (5)
. To aid installation, commercially available long-nose pliers may be used to
“spread” new water drain hoses prior to installation.
Secure water drain hoses (6) by means of cable tie and retainer (7) to front roof reinforcement.
Preparing front roof reinforcement for bonding
On both sides, additionally seal gutter grommet (arrow) with adhesive sealant
D 511 500 A2
, and spread any excess adhesive sealant.
Note
Proceed very carefully when additionally sealing the gutter grommets in order to prevent ingress of water in future.
Apply glass/paint primer
D 009 200 02 (1) all round to front roof reinforcement. Observe flash-off period of at least 10 minutes.
To aid guidance/positioning of front roof reinforcement, screw in self-produced (approx. 50-60 mm long) guide pins/threaded rods (2) at both outer mounting points.
Note
Factory-provided guide pins are a little bit too short. With longer guide pins (2) screwed in, the front roof reinforcement (with 2-component window adhesive applied) can be guided easier when being fitted to the vehicle body.
The guide pins (2) are unscrewed after installing the front roof reinforcement.
TorqFix answers live for your specific car — tell it the engine code to check the available procedures, torque figures and wiring for that variant.
Ask about my car →Other VW procedures
- Renewing rear roof reinforcement
- Installing front roof reinforcement
- Installing roof reinforcement to body, estate without sliding sunroof
- Installing roof reinforcement to body, without sliding sunroof
- Painting of front roof reinforcement and pop-up roof
- Removing and installing front roof reinforcement
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.