TorqFix

Removing and installing timing chain and drive chain for oil pump, engine codes AZQ, BME, BZG: VW Polo 9N

Removing and installing timing chain and drive chain for oil pump, engine codes AZQ, BME, BZG — VW… Read available instructions and vehicle application notes.

33 steps 6 engine codes

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Polo 9N (2001–2009)

  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Replacement notes from the steps (read the conditions below): Fit new securing bolt to oil pump sprocket.

Don't miss

  • Remove securing bolt (3). Counterhold the wheel using counterhold tool T10172.
  • The guide rail (1) was only installed on engines with engine code AZQ. It has been discontinued as replacement part.In case of repair the guide rail need not be installed.
  • Remove securing bolt (2). Use counterhold tool3036 for this.
  • Press and hold the chain tensioner piston until installation in order to prevent the components from falling apart. — Use counterhold tool3036 for this.
  • Use counterhold tool T10172 for this.

🔧 Engine codes recorded for this source

📋 Procedure

  1. Remove valve timing housing (see the separate procedure).
  2. Lock camshafts and crankshaft (see the separate procedure).
  3. Lever spring wire (1) out of stud using a screwdriver.
  4. Unscrew securing bolt (2) and remove chain tensioner.
  5. Remove securing bolt (3). Counterhold the wheel using counterhold tool T10172.
  6. Take chain sprocket for oil pump, drive chain and drive sprocket off together. [Note: The chain tensioner is fitted with the locking hole as standard.A modified chain tensioner has been implemented in order to reduce noise levels. This chain tensioner is fitted in the case of complaints and has no locking hole. Note the different repair procedures.]
  1. Press tensioning plate by hand in (direction of arrow) and lock chain tensioner using 3 mm hexagon key (1).
  1. ⚠ Press and hold the chain tensioner piston until removal in order to prevent the components from falling apart. — Remove the securing bolts (1) and remove the bolt (2).
  2. Press and hold the chain tensioner piston in direction (arrow A).
  3. In doing so, turn the chain tensioner in (direction of arrow B) until the piston is located underneath the tensioning plate.
  4. Remove securing bolt (2) and remove chain tensioner.
  5. Remove guide rail (1). [Note: The guide rail (1) was only installed on engines with engine code AZQ. It has been discontinued as replacement part. In case of repair the guide rail need not be installed.]
  1. Remove securing bolt (2). Use counterhold tool 3036 for this.
  2. Pull tensioning plate (4) and guide rail (3) forwards off guide pins.
  3. Remove timing chain from chain sprockets.
  1. Place timing chain on crankshaft chain sprocket and camshaft chain sprocket.
  2. Push tensioning plate (4) and guide rail (3) onto guide pins from front.
  3. Install second camshaft chain sprocket using new securing bolt (2). [Note: The guide rail (1) was only installed on engines with engine code AZQ. It has been discontinued as replacement part. In case of repair the guide rail need not be installed.]
  1. Tension timing chain by removing 3 mm hexagon key from of chain tensioner.
  1. Put the chain tensioner together as follows and press and hold the piston.
  1. ⚠ Press and hold the chain tensioner piston until installation in order to prevent the components from falling apart. — Use counterhold tool 3036 for this.
  2. Fit drive chain for oil pump on both chain sprockets.
  3. Fit new securing bolt to oil pump sprocket.
  1. Install chain tensioner for the oil pump drive.
  1. Use counterhold tool T10172 for this.
  2. Lever spring wire (1) onto stud using a screwdriver. [Note: The chain tensioner is fitted with the locking hole as standard.A modified chain tensioner has been implemented in order to reduce noise levels. This chain tensioner is fitted in the case of complaints and has no locking hole. Note the different repair procedures.]
  1. Tighten securing bolt (2) hand-tight.
  2. Press the chain tensioner piston in direction (arrow A).
  3. In doing so, turn the chain tensioner in (direction of arrow B) until the piston is on the tensioning plate.
  4. Secure the chain tensioner by tightening the securing bolts (1) hand-tight.
  5. Tighten securing bolts (1) and (2).
  1. Check valve timing
  2. Install timing housing (see the separate procedure).

📐 6 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 6 workshop diagrams for this job Ask about your VW AWY — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.