TorqFix

Removing and installing oil sump: VW Passat B5 (3B) (AZX)

Removing and installing oil sump — VW Passat B5 (3B) (AZX). 34 source steps and 1 tables. Check the document conditions against your vehicle.

34 steps 1 engine code 2 inline torque figures 1 original source table Showing one source document; this title group contains 80 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Passat B5 (3B)

  • Opens: engine oil

Don't miss

  • Observe environmental regulations for disposal.
  • Mark the fitting position of threaded connections (1) and locating sleeves (2) below on the left and right engine mounts.
  • To avoid having to perform wheel alignment, the subframe must only be loosened or lowered at the front end.
  • Observe expiry date of sealing compound.The oil sump must be installed within 5 minutes of applying silicone sealing compound.
  • Cut off tube nozzle at forward marking (∅ of nozzle approx. 3 mm).

🔧 Engine codes recorded for this source

AZX

🔩 Torque settings recorded in the steps

Values can differ between engine variants — check the code stamped on your block.

TorqueFastener / step
12 Nm (8.9 lb-ft)Tighten oil sump bolts to 12 Nm.
45 Nm (33 lb-ft)Tighten M10 bolts of sump/intermediate plate to 45 Nm. [Note: Let sealing compound dry for approx. 30 minutes after installing sump. Only then fill with engine oil.]

ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.

📋 Procedure

  1. Bring lock carrier into service position General body repairs, exterior 50. Lock carrier - service position.
  2. Drain engine oil. [Note: Observe environmental regulations for disposal.]
  1. Pull 3-pin connector off oil level and oil temperature sender G266.
  1. Unbolt retainers for ATF lines on torque reaction support and sump.
  1. Unbolt torque reaction support from sump.
  2. Unclip lower part (1) of starter cable retainer (arrows).
  3. Mark the fitting position of threaded connections (1) and locating sleeves (2) below on the left and right engine mounts.
  4. Unbolt both engine mountings from below.
  5. Attach support bracket 10-222A as shown.
  6. Support engine at rear lifting eye with support bracket.
  7. Tension engine slightly with spindle of support bracket.
  8. Support assembly carrier with workshop crane 1202 A. [Note: To avoid having to perform wheel alignment, the subframe must only be loosened or lowered at the front end.]
  1. First remove front bolts (2) and (3) on left and right-hand sides of subframe Then remove bolts (4).
  2. Loosen rear right gearbox mounting rear bolt (2) several turns, remove right gearbox mounting front bolt (1).
  1. Loosen left gearbox mounting nut (arrow) until it is flush with end of bolt (turned approx. 4 threads).
  1. Loosen rear left gearbox mounting rear bolt (2) several turns, remove left gearbox mounting front bolt (1).
  1. Lower subframe slowly with workshop crane.
  2. Remove workshop crane, swivel anti-roll bar down.
  3. Unbolt sump. If necessary, push assembly carrier downwards by hand slightly to be ease the loosening of the bolts on the intermediate plate.
  4. Now remove sump.
  5. Loosen sump with light blows of a rubber headed hammer if necessary.
  6. Remove sealant residue from cylinder block with a flat scraper.
  7. Remove sealant residue on sump using a rotating brush, e.g. an electric drill with a plastic brush attachment (wear safety goggles).
  8. Clean sealing surfaces. They must be free of oil and grease. [Note: Observe expiry date of sealing compound. The oil sump must be installed within 5 minutes of applying silicone sealing compound.]
  1. Cut off tube nozzle at forward marking (∅ of nozzle approx. 3 mm).
  2. Apply silicone sealing compound, as shown, to clean sealing surface on sump. Sealing compound bead must be: [Note: The sealant bead must not be thicker, otherwise excess sealing compound will enter the oil sump and may block the oil suction line strainer.]
  1. Apply silicone sealing compound bead as shown to the clean sealing surface of the sump.
  2. Install sump immediately and tighten all sump bolts lightly.
  3. Tighten sump bolts slightly.
  4. Tighten M10 bolts of sump/intermediate plate by hand.
  5. Tighten oil sump bolts to 12 Nm. — 12 Nm (8.9 lb-ft)
  6. Tighten M10 bolts of sump/intermediate plate to 45 Nm. [Note: Let sealing compound dry for approx. 30 minutes after installing sump. Only then fill with engine oil.] — 45 Nm (33 lb-ft)
  1. Install subframe Running gear, front-wheel drive and four-wheel drive 40. Removing and installing subframe.
  1. Install lock carrier with attachments General body repairs, exterior 50. Lock carrier service position.

📐 11 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 11 workshop diagrams for this job Ask about your VW AZX — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.