Removing and installing pipes for engine cooling system: VW Touareg II (7P) (CMKA, CMKB, CJTA, CYJA)
Removing and installing pipes for engine cooling system — VW Touareg II (7P) (CMKA, CMKB, CJTA… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Touareg II (7P, 2010–2018)
- Replacement notes from the steps (read the conditions below): Remove coolant hose on engine oil cooler, unscrew securing bolts and take off coolant pipe. [Note: Renew O-rings.Secure all hose connections with hose clips corresponding to the series equipment ETKA (Electronic Parts Catalogue).]
Don't miss
- Renew O-rings.Secure all hose connections with hose clips corresponding to the series equipment ETKA (Electronic Parts Catalogue).
- Before installing, clean or smoothen sealing surface for O-ring.
📋 Procedure
- ⚠ When the engine is warm, the cooling system is under pressure. Hot steam/hot coolant can escape - risk of scalding. Cover filler cap on expansion tank with a cloth and open carefully to dissipate pressure. — Drain off coolant for high-temperature cooling circuit (see the separate procedure).
- Remove air conditioner compressor Heating, air conditioning 87. Removing and installing air conditioner compressor.
- Place drip tray for workshop crane VAS 6208 beneath engine.
- Disconnect coolant hose (arrow) from engine oil cooler and drain off coolant.
- Remove bolts (1) and (2) for coolant pipes. Loosen hose clip (3).
- Move coolant pipe slightly to the left (arrow) and remove from upper coolant pipe.
- Remove bolts (arrows) and detach bracket for air conditioner compressor.
- Remove coolant hose on engine oil cooler, unscrew securing bolts and take off coolant pipe. [Note: Renew O-rings. Secure all hose connections with hose clips corresponding to the series equipment Electronic Parts Catalogue.]
- Before installing, clean or smoothen sealing surface for O-ring.
- Moisten new O-ring with coolant and slide onto coolant pipe.
- Install bracket for air conditioner compressor.
- Install air conditioner compressor Heating, air conditioning 87. Removing and installing air conditioner compressor.
- Install poly V-belt (see the separate procedure).
- Replenish coolant for high-temperature cooling circuit (see the separate procedure).
Other VW procedures
- Removing and installing coolant pipes, left coolant pipes for cooling high-voltage system
- Assembly overview - cooling system, engine side (vehicles with manual gearbox)
- Assembly overview - parts of cooling system (radiator with two fans), body side
- Checking cooling output on vehicles with automatically controlled air conditioning system (without high-voltage system)
- Checking cooling output on vehicles with automatically controlled air conditioning system (with high-voltage system)
- Checking cooling output on vehicles with manually controlled air conditioning system
- Removing and installing drive chain for valve gear – VW
- Removing and installing intake manifold lower part with fuel rail
- Removing and installing drive chain for auxiliary drives
- Removing and installing fuel tank with attached components
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.