Removing and installing left heat exchanger: VW Phaeton (3D)
Removing and installing left heat exchanger — VW Phaeton (3D). 26 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Phaeton (3D)
- Opens: coolant
- Replacement notes from the steps (read the conditions below): Check coolant pipe (B) and heat exchanger connection (C) for soiling or damage. [Note: Always renew O-ring.]
Don't miss
- To ensure that the coolant is blown out of both heat exchangers, alternately clamp off the upper coolant hose to each of the heat exchangers.
- The function of the condensation drain valve should not be impaired by conservation wax or underseal. The valve must open and close properly.In the figure the drain holes are shown with the fresh air blower installed.
- Always renew O-ring.
- Before installing dash panel, check cooling system for leaks 19.
📋 Procedure
- Remove dash panel General body repairs, interior 70. Dash panel; Removing and installing dash panel.
- Remove windscreen wiper system Electrical system 92. Removing and installing windscreen wiper system.
- Remove brake servo Brake systems 47. Removing and installing brake servo.
- Remove brake pedal Running gear 46. Removing and installing brake pedal (left-hand drive vehicles); Removing.
- Place drip tray VAS 6208 beneath engine.
- Drain cooling system (repair group 19).
- Hold coolant hose (B) into container.
- Using compressed air gun, carefully blow remaining coolant out of pump-valve unit and heat exchangers via coolant hose (A). [Note: To ensure that the coolant is blown out of both heat exchangers, alternately clamp off the upper coolant hose to each of the heat exchangers.]
- Loosen screws (A) and (B) of coolant pipe clips approx. 2 turns.
- Slightly moisten contact surface of both coolant pipes on both grommets (C) and (D) with silicon lubricant. In this way the pipes are easier to move and it is not necessary to change the position of the grommet.
- Remove footwell vent.
- Cover carpet in area under heat exchanger with waterproof foil and water absorbing paper.
- Remove clips (A).
- Release coolant pipes (D) from heat exchanger.
- Remove bracket (B).
- Pull heat exchanger (C) out of heater and air conditioning unit.
- Before installing dash panel and plenum chamber cover, check position of grommets (C) and (D) in opening for coolant pipes to plenum chamber. [Note: The function of the condensation drain valve should not be impaired by conservation wax or underseal. The valve must open and close properly. In the figure the drain holes are shown with the fresh air blower installed.]
- Heat exchanger removed: check both drain holes through heat exchanger aperture using illuminated inspection mirror. Clean drain holes, e.g. with wire.
- Heat exchanger installed: with condensation drain hose removed, clean drain holes from exterior using, for example, wire.
- Secure all connections using clips corresponding to original equipment Parts catalogue.
- Check coolant pipe (B) and heat exchanger connection (C) for soiling or damage. [Note: Always renew O-ring.]
- Moisten O-ring (A) lightly with coolant and position it on coolant pipe (B).
- Proceed in same manner to install second coolant pipe.
- Before installing dash panel, check cooling system for leaks (repair group 19).
- Before installing dash panel and plenum chamber cover, check position of grommet in opening for coolant pipes to plenum chamber. [Note: Running cooling system circulation pump V50 dry will destroy it.The coolant circulation pump V50 and the pump-valve unit may only be operated when the cooling system has been filled and bled. Do not switch ignition on.The valves of the pump-valve-unit may be damaged when the cooling system is being filled. The valves of the pump-valve-unit are closed when ignition is "“on”" and temperature preselection is "“cold”". If ignition is "“on”" and temperature preselection is "“warm”", the valves will be damaged when the system is filled. The ignition must always be switched off when filling the cooling system.]
- Fill cooling system (repair group 19).
📐 4 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Checking 2nd heat exchanger switch-off valve N317 – VW
- Coolant hose schematic diagram, vehicles with dual clutch gearbox, 2nd heat exchanger and supplementary heater
- Draining cooling system (vehicles with one heat exchanger)
- Heat exchanger for high-voltage battery VX63 with refrigerant shut-off valve for high-voltage battery heat exchanger N542
- Heat exchanger for high-voltage batteryVX63 with refrigerant shut-off valve for high-voltage battery heat exchanger N542
- Removing and installing 2nd heat exchanger switch-off valve N317
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.