Removing and installing intake manifold, engine codes BKC, BXE: VW Golf V / Jetta (1K)
Removing and installing intake manifold, engine codes BKC, BXE — VW Golf V / Jetta (1K). Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Golf V / Jetta (1K, 2003–2009)
- Replacement notes from the steps (read the conditions below): Unscrew intake manifold (arrows). [Note: Renew gaskets and seals.Observe installation location for intake manifold seal.It is very important to observe notes on installing air pipes with connector .Hose connections must be secured with clamps Electronic parts catalogue "“ETKA”".]
Don't miss
- Hoses (2) remain connected.
📋 Procedure
- Remove engine cover. [Note: Hoses (2) remain connected.]
- Detach lines (2) from air pipe.
- Remove air pipe. Raise retaining clips (1) slightly to do so.
- Disconnect connector (2) at air mass meter G70.
- Detach vent hose (1) and air hose (3).
- Separate connector (arrow) at intake manifold flap motor V157.
- Unscrew bolts (1 ... 3) and remove intake manifold flap motor V157.
- Remove intake connecting pipe with potentiometer for exhaust gas recirculation G212 and exhaust gas recirculation valve N18.
- Clamp off and detach coolant hoses (1) and (2) at cooler for exhaust gas recirculation with hose clips up to Ø 25 mm 3094.
- Clamp off and detach coolant hoses (1) and (2) with hose clips up to Ø 25 mm 3094.
- Detach vacuum hoses (arrow 2).
- Detach vacuum hose (arrow 3) from non-return valve for brake servo.
- Pull vacuum hose (arrow) off tandem pump leading to brake servo.
- Unbolt engine lifting eye at rear of cylinder head (arrow).
- Unscrew bottom connecting pipe from changeover valve for exhaust gas recirculation (arrows).
- Unscrew bolts (arrows).
- Unscrew cooler for exhaust gas recirculation with changeover valve from intake manifold (arrows) and remove.
- Unscrew intake manifold (arrows). [Note: Renew gaskets and seals. Observe installation location for intake manifold seal. It is very important to observe notes on installing air pipes with connector .Hose connections must be secured with clamps Electronic parts catalogue.]
- Fill with coolant (see the separate procedure).
📐 12 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Assembly overview - intake manifold (engine codes BAG, BKG)
- Assembly overview - intake manifold (engine codes BLF, BLN, BLP)
- Assembly overview - upper part of intake manifold (vehicles with engine codes BRN, BRP and BTT)
- Removing and installing complete intake manifold, engine codes BSE, BSF
- Removing and installing complete intake manifold, engine codes BSE, BSF, CCSA, CMXA
- Removing and installing exhaust gas recirculation cooler (engine codes BKC, BXE)
- Removing and installing accelerator module
- Removing, installing and checking ceramic glow plugs – VW
- Removing cylinder head - vehicles up to approx. 05.2005
- Removing cylinder head - vehicles from approx. 06.2005 onwards
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.