Removing and installing high-voltage battery 1AX2: VW Golf VII (5G) (CUKB)
Removing and installing high-voltage battery 1AX2 — VW Golf VII (5G) (CUKB). 33 source steps and 1 tables. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Golf VII (5G, 2012–2020)
- Opens: coolant
- Special tools named: 3094, VAS 6131/13, VAS 6131/10
- Replacement notes from the steps (read the conditions below): Keep scissor-type assembly platformVAS 6131 B in removal position to ensure proper reinstallation of high-voltage battery. [Note: Renew bolts that are tightened with specified tightening angle.]
Don't miss
- Make sure that threaded spindles are screwed in completely.
- Raise scissor-type assembly platformVAS 6131 B until support elements are right below the high-voltage battery, but do not contact it yet.
- Renew bolts that are tightened with specified tightening angle.
🔧 Engine codes recorded for this source
🔩 Torque settings recorded in the steps
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 20 Nm (15 lb-ft) | Bolt base plates for support elements to scissor-type assembly platform, and tighten bolts to 20 Nm. |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- De-energise high-voltage system (see the separate procedure).
- Remove underbody covers General body repairs, exterior 66. Underbody cover; Removing and installing underbody covers.
- Remove silencer (see the separate procedure).
- Remove heat shield for high-voltage battery General body repairs, exterior 66. Mouldings/trims/extensions; Removing and installing floor heat shield.
- Open filler cap (3) on coolant expansion tank. To do this, break anti-tamper seal (1).
- Set drip tray for workshop hoist VAS 6208 underneath.
- Unscrew nut (1) and bolt (4).
- Remove potential equalisation line (2).
- Disconnect high-voltage cable (3), and lay it to one side.
- Fit protective cap 12E 971 883(arrow) onto high-voltage connection on high-voltage battery 1AX2.
- Clamp off coolant hoses with hose clamps 3094.
- Lift retaining clips, remove coolant hoses (1, 2) from high-voltage battery, and drain coolant.
- If fitted, disconnect electrical connector (4).
- Disconnect electrical connector (3).
- Lay brake lines (1) and wiring harness (2) to one side.
- Lay fuel lines (1) to one side.
- If fitted, lay fuel line (2) for auxiliary heater to one side.
- Set up scissor-type assembly platform VAS 6131 B with support set for Audi VAS 6131/10 and supplementary set VAS 6131/13 as follows:
- First, bolt mounting elements to scissor-type mounting platform and tighten bolts by hand.
- Place scissor-type assembly platform in a horizontal position.
- Position scissor-type assembly platform at right angles relative to direction of travel under high-voltage battery.
- Fit support elements from VAS 6131/10 at front of high-voltage battery, as shown in illustration.
- Fit support elements from VAS 6131/10 and VAS 6131/13 at rear of high-voltage battery, as shown in illustration.
- Make sure that threaded spindles are screwed in completely.
- Raise scissor-type assembly platform VAS 6131 B until support elements are right below the high-voltage battery, but do not contact it yet.
- Turn spindles for the support elements upwards until all locating lugs make contact with the mounting points.
- Bolt base plates for support elements to scissor-type assembly platform, and tighten bolts to 20 Nm. — 20 Nm (15 lb-ft)
- Unscrew bolts (1).
- Lower high-voltage battery (3) using scissor-type assembly platform.
- Keep scissor-type assembly platform VAS 6131 B in removal position to ensure proper reinstallation of high-voltage battery. [Note: Renew bolts that are tightened with specified tightening angle.]
- Before connecting high-voltage cable to high-voltage battery 1AX2 pull protective cap 12E 971 883 off high-voltage connection on high-voltage battery 1AX2.
- Replenish coolant (see the separate procedure).
- Re-energise high-voltage system (see the separate procedure).
📐 10 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Removing and installing high-voltage battery 1 AX2 – VW CUKB
- Disconnecting and connecting battery, vehicles with high-voltage system
- Disconnecting and connecting battery, vehicles without high-voltage system
- Heat exchanger for high-voltage battery VX63 with refrigerant shut-off valve for high-voltage battery heat exchanger N542
- Heat exchanger for high-voltage batteryVX63 with refrigerant shut-off valve for high-voltage battery heat exchanger N542
- Raising high-voltage battery 1AX2
- Checking fuel system pressurisation pump G6 - vehicles with 5-cyl. engine
- Removing and installing cylinder head - engine codes CUKB, CXUA
- Removing and installing turbocharger - all engine codes except CUKB, CXUA
- Removing and installing fuel delivery unit/fuel gauge sender - front-wheel drive vehicles without high-voltage system
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.