Removing and installing high-pressure pump: engine code CAVD — VW Golf V / Jetta (1K)
Removing and installing high-pressure pump — engine code CAVD — VW Golf V / Jetta (1K). Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Golf V / Jetta (1K, 2003–2009)
- Opens: coolant
- Timing references: follow the source instructions for shaft position, timing marks and any locking tools
Don't miss
- Turn crankshaft in direction of engine rotation to 1st cyl. TDC (do not drain coolant and do not remove sealing caps for camshafts).
- Catch escaping fuel in a cloth.
- When loosening union nuts, counterhold threaded connections on high-pressure pump and on lower part of intake manifold/fuel rail using a wrench.
- Moisten high-pressure pump roller tappet with clean engine oil.The high-pressure pump O-ring must always be renewed.
🔧 Engine codes recorded for this source
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 18 Nm (13 lb-ft) | Tighten union nut (1) of high-pressure line to 18 Nm. |
| 18 Nm (13 lb-ft) | Tighten union nut (3) of high-pressure line to 18 Nm. |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- ⚠ The injection system consists of a high-pressure section (maximum approx. 120 bar) and a low-pressure section (approx. 6 bar).Prior to opening the high-pressure area, e.g. when removing the high-pressure pump, fuel rail, injectors, a fuel line, or the fuel pressure sender G247, the fuel pressure in the high-pressure area must be reduced to a residual pressure of approx. 6 bar. The appropriate procedure is described in the chapter on "“releasing pressure in the high-pressure section of the fuel system”". — Remove engine cover panel (see the separate procedure).
- Turn crankshaft in direction of engine rotation to 1st cyl. TDC (do not drain coolant and do not remove sealing caps for camshafts).
- Remove intake connecting pipe (see the separate procedure).
- Pull fuel supply line (right arrow) off high-pressure pump. [Note: Catch escaping fuel in a cloth.]
- Remove wiring guide (2) and take clip (4) off high-pressure line. [Note: When loosening union nuts, counterhold threaded connections on high-pressure pump and on lower part of intake manifold/fuel rail using a wrench.]
- Loosen union nuts (3) and (1) of high-pressure line.
- Evenly unscrew securing bolts (arrows).
- Pull high-pressure pump (3) and roller tappet (1) out of camshaft housing. [Note: Moisten high-pressure pump roller tappet with clean engine oil. The high-pressure pump O-ring must always be renewed.]
- Slide roller tappet (1) into camshaft housing.
- Insert new, lubricated O-ring (2) in groove of high-pressure pump (3).
- Place high-pressure pump (3) onto camshaft housing.
- Screw in securing bolts (arrows) by hand until bolt heads are seated on flange.
- Tighten securing bolts (arrows) evenly until flange is seated on camshaft housing.
- Tighten union nuts of high-pressure line (1) and (3) hand-tight.
- Install wiring guide (2) and fit clip (4) on high-pressure line. [Note: When loosening union nuts, counterhold threaded connections on high-pressure pump and on lower part of intake manifold/fuel rail using a wrench.]
- Tighten union nut (1) of high-pressure line to 18 Nm. — 18 Nm (13 lb-ft)
- Tighten union nut (3) of high-pressure line to 18 Nm. — 18 Nm (13 lb-ft)
- Secure fuel supply line and plug (arrows) on high-pressure pump.
- Install intake connecting pipe and air filter (see the separate procedure).
📐 4 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Removing and installing high-pressure pump (engine code BMK)
- Removing and installing toothed belt for high-pressure pump (engine code BMK)
- Checking delivery pressure of fuel system pressurisation pump G6, engine code CFHC
- Checking flow rate at high-pressure pump
- Checking fuel low-pressure at high-pressure pump
- Checking high-pressure pump
- Removing and installing fuel system diagnosis pump
- Removing and installing oil spray jets – VW Jetta VI
- Removing and installing coolant circulation pump V50
- Emptying fuel tank if more than 3/4 full, engine codes CDLG, CAVB, CAVC, CAVD, CBZA, CBZB, CTHD, CTKA
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.