Removing and installing high-pressure pipe: VW Touareg II (7P) (CGEA, CGFA)
Removing and installing high-pressure pipe — VW Touareg II (7P) (CGEA, CGFA). 10 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Touareg II (7P, 2010–2018)
Don't miss
- Disregard (item 1).The illustration shows, as an example, the turbocharger for cylinder bank 2 (left-side).
- Do not attempt to reshape the high-pressure pipe.
- First tighten union nuts hand-tight onto stop; make sure that high-pressure pipe is free of stress when doing this.
- Tighten union nut with torque wrenchV.A.G 1331 and tool insert, 17 mmV.A.G 1331/6. To do this, counterhold on hexagon of connecting union using an open-end spanner.
- Do not tighten bolt for retainer until high-pressure pipe has been tightened.
📋 Procedure
- Remove supercharger
- Remove (arrow) hose for secondary air forwards out of bracket and detach; press release buttons for this.
- Unscrew bolts (arrows) and lay intake manifold flap potentiometer G336 together with intake manifold flap vacuum actuator to side. [Note: Disregard (item 1).The illustration shows, as an example, the turbocharger for cylinder bank 2 (left-side).]
- Unscrew nuts and bolts (arrows) and remove guard (A).
- ⚠ The fuel system is pressurised. Risk of injury due to fuel which may spurt out. Wear eye protection. Wear protective gloves. Release pressure: place clean cloth around connection (1), and carefully open connection. — Tighten union nuts (2) and (3); counterhold threaded connection to do this.
- Remove bolts (arrows). [Note: Do not attempt to reshape the high-pressure pipe.] [Note: The high-pressure pipe connections must not show any signs of damage. Do not attempt to reshape the high-pressure pipe.]
- First tighten union nuts hand-tight onto stop; make sure that high-pressure pipe is free of stress when doing this.
- Tighten union nut with torque wrench V.A.G 1331 and tool insert, 17 mm V.A.G 1331/6. To do this, counterhold on hexagon of connecting union using an open-end spanner.
- Do not tighten bolt for retainer until high-pressure pipe has been tightened.
- Install supercharger
Other VW procedures
- High pressure pipe - renew
- Checking flow rate at high-pressure pump
- Checking fuel low-pressure at high-pressure pump
- Checking fuel pressure in high-pressure section – VW 1.4
- Checking high-pressure pump
- Checking high pressure sender-G65-
- Removing and installing compressor – VW Touareg II
- Draining and filling coolant, high-temperature circuit
- Removing and installing left catalytic converter, bank 2
- Removing and installing left engine mounting – VW 6.0
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.