Removing and installing alternator, 1.4 l 55 kW or 74 kW injection engine: VW Polo 9N
Removing and installing alternator, 1.4 l 55 kW or 74 kW injection engine — VW Polo 9N. 18 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Polo 9N (2001–2009)
Don't miss
- Ensure when installing engine cover, that the arrow (2) on hose (1) aligns with mark (3) on crankcase breather union (4).
📋 Procedure
- Disconnect battery (see the separate procedure).
- Lift off engine cover, by pulling upwards off fasteners (arrows).
- Disconnect hose (1) from crankcase breather union (4) and remove engine cover from vehicle.
- Separate DF wire connector (1) and pull off protective cap (2).
- Unscrew battery positive wire (arrow) from alternator.
- ⚠ Before removing, mark the top side and direction of rotation of the poly V-belt. When fitting, pay attention to correct direction and installation position. If the belt is installed in the wrong position or against direction of rotation, the belt will be destroyed! — Release tension of poly V-belt by swivelling tensioning element in (direction of arrow) using a 16 mm open-jaw spanner.
- Lock tensioning element using locking pin T10060A.
- Remove poly V-belt.
- Remove alternator securing bolts (arrows).
- Remove wire holder (arrow) from back of alternator.
- Remove alternator from vehicle.
- ⚠ When installing used poly V-belts observe the direction of rotation marked on removal!Before installing poly V-belt, make sure all assemblies (alternator, air conditioner compressor) are firmly in position. When fitting belt, ensure that poly V-belt seats correctly in pulleys! — Drive threaded sleeves (A) roughly 4 mm in (direction of arrow) out of alternator housing.
- On vehicles with no air conditioner compressor, screw wire holder (arrow) to back of alternator in 6 o'clock position.
- On vehicles with air conditioner compressor, screw wire holder (arrow) to back of alternator in 4 o'clock position.
- Ensure when installing engine cover, that the arrow (2) on hose (1) aligns with mark (3) on crankcase breather union (4).
- Tighten all threaded connections to the specified torques (value given in the factory table, not available here).
- Reconnect battery (see the separate procedure).
- Start engine and check belt is running correctly.
📐 10 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Removing and installing air cooled alternator, 6-cyl. 3.2 l fuel injection engine
- Removing and installing alternator, 1.2 l 40 kW or 47 kW injection engine
- Removing and installing alternator, 1.2 l 55 kW injection engine
- Removing and installing alternator, 1.2 l injection engine with air conditioning system
- Removing and installing alternator, 1.4 l 55 kW injection engine
- Removing and installing alternator, 1.4 l 59 kW injection engine with air conditioning system
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.