Cylinder head removing and installing — VW
Cylinder head removing and installing — VW. Original source text. Read the instructions and application notes; confirm the exact vehicle before use.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
📋 Procedure
ℹ️ Torque figures below come verbatim from workshop data — always cross-check against your vehicle's factory manual before final tightening.
Special tools, workshop equipment, testers, measuring instruments and auxiliary items required
10-222A Support assembly
10-222 A/8 Adapter
3415 Counter support
3415/1 Pin
T 10014 Retainer
T 10016 Camshaft locking device
V.A.G 1306 Drip tray
V.A.G 1331 Torque wrench (5...50 Nm)
V.A.G 1332 Torque wrench (40...200 Nm)
VAS 5024 Assembly tool for spring-type clips
D 188 003 A1 Sealant
Prerequisites
The engine must only be lukewarm.
The pistons must not be positioned at TDC.
Removing
First check whether a coded radio is fitted. If this is the case obtain the anti-theft coding.
With the ignition switched off disconnect the battery earth strap.
Remove cover above camshaft housing -arrows-.
Open and close the expansion tank cap to release pressure in cooling system.
Drain coolant => Page
19-13.
Loosen hose clips and pull coolant hoses off coolant thermostat housing.
Pull warm air intake hose off warm air collector plate.
Remove air cleaner together and air intake connecting piece:
=> Repair group 24; Servicing injection system; Dismantling and assembling air cleaner.
4-Cyl. Injection engine, (1,4 l-Engine), Mechanics
Servicing injection system
Dismantling and assembling air cleaner.
Remove oil dipstick tube.
Warning!
Fuel supply pipes are under pressure! Before removing from hose connection wrap a cloth around the connection. Then release pressure by carefully pulling hose off connection.
Now disconnect fuel return and vent pipes (press release key).
Loosen or separate the following components:
the charcoal filter solenoid valve 1 hose (N80) to throttle valve control part the vacuum hose from the throttle valve to the brake servo
the vacuum hose from the exhaust gas recirculation valve to the vacuum hose distributor piece to the air cleaner
The 2 pin connector from knock sensor (rear of cylinder block) and the 4 pin connector from intake manifold pressure sender (front right under intake manifold).
The connector from engine speed sender below oil dipstick tube bracket, and pull connector out from retainer
The throttle valve control part and Hall sender connector
The coolant temperature sender connector , the oil pressure switch and exhaust the gas recirculation valve
Injector connectors
Remove camshaft housing
Notes:
The camshafts are mounted in the camshaft housing on this engine. Therefore, the main drive toothed belt must be removed before the camshaft housing can be removed.
Remove and install camshafts =>Page
15-45
, Servicing valve gear.
Work sequence
First remove both toothed belts
=>page
15-8.
Remove warm air collector plate from front exhaust pipe and from exhaust manifold.
Remove front exhaust pipe from exhaust manifold.
Remove ignition rod coils together with H.T. cables.
Remove exhaust gas recirculation valve and the connecting pipe to the throttle valve.
Loosen camshaft housing bolts (from outside to inside and in cross-over sequence) and remove.
Carefully lift camshaft housing off.
Remove roller rocker finger together with support elements and place on a clean surface. Ensure the roller rocker fingers and the support elements are not interchanged.
Now lift the engine slightly again using spindle -B-.
Note:
Both lifting eyes are located on the cylinder head, therefore an additional bracket must be secured to the cylinder block to support the engine.
Attach bracket T 10014 to cylinder block using threaded hole in vicinity of coolant pump -as illustrated-.
Lift the engine slightly using the second spindle -A- until the spindle -B- is relieved.
Remove spindle -B-.
Remove cylinder head
Pull the clamps which secure the coolant pipe to coolant pump off the thermostat housing.
Loosen socket head bolts in the sequence given and then remove complete.
Carefully lift cylinder head off.
Installing
Notes:
Only remove the new cylinder head gasket from its packing immediately before installing.
Handle the new gasket with extreme care. Damage will lead to leaks.
Place a clean cloth into the cylinders so that no dirt or emery cloth particles can get in between cylinder wall and piston.
Carefully clean cylinder head and cylinder block sealing surfaces. Please ensure that no scoring or scratches are formed (when using abrasive paper the grade must not be less than 100).
Carefully remove metal particles, emery remains and cleaning cloths.
Install cylinder head
Set No. 1 cylinder piston to top dead centre and then turn crankshaft back slightly.
Camshaft sprockets locked into camshaft housing fitting holes with T 10016 and secured against turning.
Fit the new cylinder head gasket. The inscription (Part No.) must be legible.
Place cylinder head on. When doing this observe the centralizing pins in cylinder block.
Fit new cylinder head bolts and tighten hand tight.
Tighten cylinder head in tightening sequence as follows:
Tighten all bolts to 30 Nm.
Then tighten all bolts 1/4 turn (90 °) turn further with a rigid wrench.
Then tighten all bolts again 1/4 turn (90 °) further
Insert support element in cylinder head and fit roller rocker finger onto respective valve stem end or support element.
Install camshaft housing,
=>page
15-25.
The rest of the assembly is basically in reverse order to the dismantling sequence.
Filling with new coolant => Page
19-13.
Interrogating and erasing error log:
=> Repair group 01; Fault memory; Interrogating and erasing fault memory of engine control unit
4-Cyl. Injection engine, (1,4 l-Engine), Mechanics
Fault memory
Interrogating and erasing fault memory of engine control unit
Perform the work sequence "Procedure after open circuit in voltage supply".
=> Repair group 24; Engine control unit; Procedure after voltage supply open circuit.
4-Cyl. Injection engine, (1,4 l-Engine), Mechanics
Engine control unit
Procedure after voltage supply open circuit.
TorqFix answers live for your specific car — tell it the engine code to check the available procedures, torque figures and wiring for that variant.
Ask about my car →Other VW procedures
- Assembly overview - cylinder head
- Assembly overview - cylinder head cover
- Cylinder head
- Cylinder head - assembly and disassembly
- Cylinder head - assembly overview
- Cylinder head cover with exhaust and inlet camshafts - remove and install
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.