TorqFix

Checking Lambda probe heating: VW

Checking Lambda probe heating — VW. Original source text. Read the instructions and application notes; confirm the exact vehicle before use.

factory workshop text

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

📋 Procedure

ABV
Special tools, testers, measuring instruments and auxiliary items required

Test box V.A.G 1598/18
Hand multimeter V.A.G 1526 or multimeter V.A.G 1715
Adapter set V.A.G 1594
Current flow diagram

Check conditions

Fuse 18 must be OK.
The battery voltage must be at least 11.5 V.
Fuel pump relay must be OK

Test sequence

Separate 4 pin connector (black) to Lambda probe before catalyst (G39) -1-.

Check probe heating at connector contacts 1+2 for continuity

If the specification is not attained:

Replace Lambda probe (G39).

If the specification is attained:

Connect multimeter to measure voltage at contacts 1+2 of connector to Motronic control unit.
Start engine and run at idling speed.

Specification: 11...15 V

Switch off ignition.

If no voltage was present:

Connect test box V.A.G 1598/18 to control unit wiring loom.

Vehicles08.95 ▸

Check wiring between test box and 4 pin connector for open circuit according to current flow diagram.
Contact 2+socket 12
Wire resistance: Max. 1.5 ω

If the specification is attained:

Check wiring from contact 1 to fuel pump relay (J17) according to current flow diagram.

=> Current flow diagrams, Electrical fault finding and Fitting locations binder

If no wiring fault is detected:

Replace Lambda probe (G39).

Vehicles ▸07.95

Pull relay for Lambda probe heating (J278) out from relay chamber.

=> Current flow diagrams, Electrical fault finding and Fitting locations binder

Check wiring between 4 pin connector contact 1 + chamber 8 on relay connector for open circuit according to current flow diagram:
Specification: max.1.5 ω
Additional check wiring between connector contact 2 + engine earth for open circuit:
Specification: max.1.5ω
Check wiring for short circuit to one another
Contact 1 + 2
Specification: ∞ω
Switch on ignition.
Bridge test box sockets 1+9.
Measure activation voltage at relay chamber pin 6:

Specification: At least 11.5 V

No voltage is displayed:

Check wiring to current supply relay (J271) according to current flow diagram.

If no wiring fault is detected:

Renew current supply relay (J271).
Then bridge test box sockets 1+6.
Measure activation voltage of relay connector 2:

Specification: At least 11.5 V

Switch off ignition.

If no voltage was present:

Check wire from fuse 18 to relay chamber pin 2 for open circuit.

If not open circuit can be found:

Check wire between test box socket 28 and relay chamber pin 4 for open circuit using current flow diagram.
Specification: Max. 1.5 ω

If the specifications are attained:

Renew Lambda probe heating relay (J278).

Is this your exact engine?

TorqFix answers live for your specific car — tell it the engine code to check the available procedures, torque figures and wiring for that variant.

Ask about my car →

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.