TorqFix

OM611 (611.960) in 202 — MERCEDES-BENZ

OM611 (611.960) in 202 — Mercedes-Benz. 155 source steps. Read the instructions and application notes; confirm the exact vehicle before use.

155 steps 1 engine code

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Opens: coolant, fuel
  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Special tools named: locking tool
  • Replacement notes from the steps (read the conditions below): Note: Use new bolts Renew the seal Renew the bolt(s)

Don't miss

  • Mark timing chain and camshaft gearwheels to each other with paint
  • The paint on the camshaft gearwheel and chain must be aligned
  • Top up the coolant level to the MAX mark

🔧 Engine codes recorded for this source

📋 Procedure

Special tools

  • Crankshaft locking tool
  • Camshaft locking tool

General

  1. Note: Be aware of security codes on radios

Removal

  1. Disconnect the battery earth cable
  2. Remove the engine/gearbox lower covers
  3. Drain the coolant from the engine block and radiator
  4. Remove the ancillary drive belt
  5. Remove the engine upper cover(s)
  6. Disconnect the thermostat hoses
  7. Remove the air filter with the inlet hose
  8. Disconnect the vacuum hose from the turbocharger actuator
  9. Disconnect the injector wiring
  10. Remove the injector lines
  11. Press in the locking clamps
  12. Remove the fuel return pipe
  13. Remove the clamp(s)
  14. Remove the injectors
  15. Note: If the injectors cannot be removed easily, use a special tool for removal
  16. Disconnect the crankcase breather hose
  17. Remove the Hall sensor connection
  18. Disconnect all the remaining electrical connections
  19. Remove the cylinder head cover
  20. Turn the crankshaft to TDC for cylinder 1
  21. Fit the crankshaft locking tool
  22. Remove the dipstick tube
  23. Remove pre-delivery pump
  24. Remove the vacuum pump
  25. Remove the bolts
  26. Raise the locking ratchet of the top slide rail
  27. Use a screwdriver
  28. Slide the cover forward
  29. Remove the cover
  30. Check that cylinder 1 is still at TDC
  31. Lock the camshaft
  32. Unbolt the coupling from the camshaft
  33. Note: Use a wrench to counter-hold
  34. Remove the top chain slide cover
  35. Mark timing chain and camshaft gearwheels to each other with paint
  36. Remove the chain tensioner
  37. Remove the exhaust camshaft gearwheel
  38. Remove the camshaft bearing caps
  39. In the order shown
  40. In several stages
  41. Note: Check the bearing-cap marks
  42. Remove the camshafts
  43. Remove the camshaft housing
  44. Remove the high-pressure line(s)
  45. Remove the bracket
  46. Disconnect the fuel return line
  47. Remove the high-pressure pump
  48. Remove the bolt
  49. Remove the bush
  50. Remove the intermediate gearwheel
  51. Check that all wiring and hoses are disconnected
  52. Disconnect the coolant hoses
  53. Disconnect the fuel feed line
  54. Remove the bolts
  55. Lift the fuel cooler
  56. Disconnect the fuel return line
  57. Remove the fuel cooler
  58. Disconnect the fuel filter lines
  59. Remove the fuel filter
  60. Disconnect the fuel lines
  61. Remove the heat exchanger
  62. Disconnect the inlet manifold vacuum hoses
  63. Disconnect the starter motor electrical connections
  64. Disconnect the crankshaft sensor
  65. Remove the inlet manifold
  66. Vehicles equipped with automatic gearbox:
  67. Remove the gearbox dipstick
  68. Remove the pre-catalytic converter from the turbocharger
  69. Remove the air hose
  70. Disconnect the turbocharger oil return hose from the cylinder block
  71. Remove the turbocharger bracket
  72. Remove the cylinder head bolts
  73. In the reverse order to that shown
  74. Remove the cylinder head together with the exhaust manifold
  75. Remove the cylinder head gasket

Pre installation checks

  1. Check the cylinder head bolts
  2. Refer to 'Adjustment data/Torque settings'

Installation

  1. Fit the cylinder head gasket
  2. Fit the cylinder head
  3. Tighten the cylinder head bolts
  4. Cylinder head torque settings: refer to 'Adjustment data/Torque settings'
    This instruction refers the head-bolt tightening stages to separate adjustment data; it does not supply those stages itself. Do not substitute a figure for another fastener. Have the matching head-bolt sequence and tightening stages available before reassembly.
  5. In the order shown
  6. Refit the turbocharger bracket
  7. Reconnect the turbocharger oil return hose to the cylinder block
  8. Refit the air hose
  9. Refit the pre-catalytic converter to turbocharger
  10. Vehicles equipped with automatic gearbox:
  11. Refit the gearbox dipstick
  12. Refit the inlet manifold
  13. Reconnect the crankshaft sensor
  14. Reconnect the starter motor wiring
  15. Reconnect the inlet manifold vacuum hoses
  16. Refit the heat exchanger
  17. Reconnect the fuel lines
  18. Refit the fuel filter
  19. Reconnect the fuel filter lines
  20. Reconnect the fuel return line
  21. Refit the fuel cooler
  22. Reconnect the fuel feed line
  23. Reconnect the coolant hoses
  24. Check that all wiring and hoses are reconnected
  25. Refit the intermediate gearwheel
  26. Refit the bush
  27. Refit the bolt
  28. Refit the high-pressure pump
  29. Reconnect the fuel return line
  30. Refit the bracket
  31. Refit the high-pressure line(s)
  32. Refit the camshaft housing
  33. Fit the camshafts
  34. Align the marks
  35. Remove the crankshaft locking tool
  36. Turn the crankshaft to 30° BTDC
  37. Refit the camshaft bearing caps
  38. Note: Check the bearing-cap marks
  39. In the order shown
  40. In several stages
  41. Turn the crankshaft to TDC for cylinder 1
  42. Fit the crankshaft locking tool
  43. Fit the inlet camshaft locking tool
  44. Fit the exhaust camshaft gearwheel with the timing chain
  45. The paint on the camshaft gearwheel and chain must be aligned
  46. Note: Use new bolts
  47. Fit the chain tensioner
  48. Renew the seal
  49. Refit the top chain slide cover
  50. Refit the coupling to camshaft
  51. Note: Use a wrench to counter-hold
  52. Refit the cover
  53. Refit the bolts
  54. Refit the vacuum pump
  55. Refit the predelivery pump
  56. Refit the dipstick tube
  57. Remove the crankshaft locking tool
  58. Remove the camshaft locking tool
  59. Refit the cylinder head cover
  60. Reconnect all the remaining electrical connections
  61. Reconnect the Hall sensor wiring
  62. Refit the crankcase breather hose
  63. Refit the injectors
  64. Refit the clamp(s)
  65. Renew the bolt(s)
  66. Reconnect the fuel return line
  67. Pull back the locking clamps
  68. Refit the injector lines
  69. Reconnect the injector wiring
  70. Reconnect the vacuum hose to turbocharger actuator
  71. Refit the air filter with the inlet hose
  72. Reconnect the thermostat hoses
  73. Refit the engine upper cover(s)
  74. Fit the ancillary drive belt
  75. Top up the coolant level to the MAX mark
  76. Refit the engine/gearbox lower covers
  77. Reconnect the battery earth cable

📐 26 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.