Removing and installing turbocharger, biturbo: VW (CDCA, CNEA, CSHA)
Removing and installing turbocharger, biturbo — VW (CDCA, CNEA, CSHA). 28 source steps and 1 torque figure. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
- Replacement notes from the steps (read the conditions below): Remove gasket for exhaust manifold (3). [Note: Renew connecting pipes after each removal.Renew all gaskets, O-rings and self-locking nuts.] Fit new double seal (2) onto the respective line connection (1) and secure by screwing in the corresponding banjo bolt (3).
Don't miss
- Two different versions of exhaust gas recirculation cooler may be installed.
- Renew connecting pipes after each removal.Renew all gaskets, O-rings and self-locking nuts.
- Check oil supply line (arrow) for damage after installing .
🔧 Engine codes recorded for this source
This source is from the Volkswagen commercial-vehicle documentation. The previous catalogue make label was incorrect; confirm the source vehicle and engine before use.
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 14.5 Nm (11 lb-ft) | If studs need to be renewed, tighten them to 14.5 Nm. Note the installation location of the studs. |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- ⚠ When a mechanical fault is found on the turbocharger, e.g. a destroyed compressor impeller, it is not only sufficient to renew the turbocharger. To avoid subsequent damage, the following work must be carried out:Check air filter container, air filter element and intake hoses for dirt. Check the whole charge air path and charge air cooler for foreign objects. If foreign objects are found in the charge air system, the charged air routing must be cleaned and the charge air cooler must be renewed, if necessary. — If fitted, remove underbody guard General body repairs, exterior 66. Underbody guard; Removing and installing underbody guard.
- Remove air filter housing (see the separate procedure).
- Remove particulate filter (see the separate procedure).
- Remove front exhaust pipe with catalytic converter (see the separate procedure).
- Loosen clip (2).
- Pull charge air hose (1) off turbocharger. [Note: Two different versions of exhaust gas recirculation cooler may be installed.]
- Disconnect connector (1) at position sender for charge pressure positioner G581(3).
- If fitted, disconnect connector (2) from charge pressure sender 2G447(1).
- Remove pipe (see the separate procedure).
- Remove bolts (2 and 3).
- Remove pipe (1) from exhaust gas recirculation cooler.
- Unscrew bolts (1, 2 and 3).
- Remove bracket (5).
- Detach exhaust gas recirculation cooler (4).
- Remove oil supply line from turbocharger (see the separate procedure).
- ⚠ Avoid damage to oil supply line. Observe notes. When doing this, ensure that no pressure is exerted on the rod. Do not hold onto the rod when removing the turbocharger. When carrying the turbocharger, always hold it by the pipes and not by the rods. Bent rods impair the functioning of the turbocharger. — Loosen clamp and disconnect oil return line.
- Undo and remove bolts (2) for oil return line at bottom of turbocharger (1).
- Unscrew bolt (2) for turbocharger (1) at lower bracket.
- Disconnect connector (2) from exhaust gas temperature sender 1G235.
- Lay wiring harness (1) to one side.
- Remove bolts (1 … 8).
- Remove turbocharger with exhaust manifold upwards.
- Unscrew bolts (1) on coolant pipe bracket (2).
- Remove gasket for exhaust manifold (3). [Note: Renew connecting pipes after each removal. Renew all gaskets, O-rings and self-locking nuts.]
- If studs need to be renewed, tighten them to 14.5 Nm. Note the installation location of the studs. — 14.5 Nm (11 lb-ft)
- Install turbocharger with new oil return line.
- Fit new double seal (2) onto the respective line connection (1) and secure by screwing in the corresponding banjo bolt (3).
- Check oil supply line (arrow) for damage after installing (see the separate procedure).
Other VW procedures
- Checking vacuum unit for turbocharger, biturbo
- Removing and installing turbocharger, biturbo
- Removing and installing turbocharger, “biturbo engine”
- Removing and installing turbocharger, “biturbo engine”, vehicles with four-wheel drive
- Adjusting turbocharger vacuum unit (engine code BYD) – VW BYD
- Adjusting turbocharger vacuum unit (engine codes BZB, CGYA, CDAA, CDAB)
- Checking flow rate at high-pressure pump
- Checking flow rate ahead of fuel filter
- Checking regulating flap potentiometer G584
- Checking vacuum hoses leading to non-return valve, solenoid valves N220 and N75 changeover valve N345
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.