Removing and installing left-side intake manifold (bottom section): vehicles from 10.2004 onwards — Audi A8 D3 (4E) (ASB, BNG)
Removing and installing left-side intake manifold (bottom section) — vehicles from 10.2004 onwards… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi A8 D3 (4E, 2002–2010)
- Opens: coolant
- Replacement notes from the steps (read the conditions below): Move coolant bleeder line to one side and remove left-side intake manifold (bottom section). [Note: Block off intake ports in cylinder head with clean rags.] [Note: Renew gaskets and seals.]
Don't miss
- Block off intake ports in cylinder head with clean rags.
- Fit banjo bolt for coolant bleeder line with a new seal and screw in 2 … 3 turns, before installing left-side intake manifold (bottom section).
- Ensure that high-pressure pipes are not under tension.
- The return lines can only be renewed together with the pressure retention valve as one unit.
- If there is any air left in the fuel system, the engine may switch to the backup mode ('emergency running' mode) during the road test. Switch off the engine and erase the fault memory. Then continue the road test.
📋 Procedure
- ⚠ Observe rules for cleanliness when working on the injection system (see the separate procedure). — Remove intake manifold (top section) (see the separate procedure).
- Drain off coolant (repair group 19).
- Unscrew union nuts (arrows) and detach high-pressure pipes.
- Unscrew union nuts (1 ... 4) and detach high-pressure pipes.
- Remove mechanical exhaust gas recirculation valve (repair group 26).
- Unscrew retaining pin (2) for engine cover panel at intake manifold (bottom section).
- Unclip exhaust gas recirculation cooler change-over valve N345(item 1) from bracket.
- Remove bracket for exhaust gas recirculation cooler change-over valve N345.
- Remove banjo bolt for coolant bleeder line using jointed wrench as illustrated.
- Unplug electrical connector (1) at intake manifold flap 2 motor V275.
- Remove bolts (arrows) and detach intake manifold (bottom section) with intake manifold flap motor 2V275.
- Move coolant bleeder line to one side and remove left-side intake manifold (bottom section). [Note: Block off intake ports in cylinder head with clean rags.] [Note: Renew gaskets and seals.]
- Fit banjo bolt for coolant bleeder line with a new seal and screw in 2 … 3 turns, before installing left-side intake manifold (bottom section).
- Install mechanical exhaust gas recirculation valve (repair group 26).
- Install intake manifold (top section) (see the separate procedure).
- Tighten union nuts on high-pressure pipes hand-tight initially.
- Ensure that high-pressure pipes are not under tension.
- To tighten union of high-pressure pipe at high-pressure pump, use torque wrench V.A.G 1331 with socket insert AF 14, flared ring spanner V.A.G 1331/8.
- To tighten unions of high-pressure pipes at rail elements, use torque wrench V.A.G 1331 with ratchet V.A.G 1331/1 and socket, 14 mm 3150.
- To tighten unions of high-pressure pipes at rail elements, use torque wrench V.A.G 1331 with open end spanner insert, AF 19V.A.G 1331/5.
- To tighten union of high-pressure pipe at high-pressure pump, use torque wrench V.A.G 1331 with ratchet V.A.G 1331/1 and socket T40055, 17 mm.
- Fill cooling system (repair group 19).
- Check fuel system for leaks.
- Run engine at idling speed for several minutes and then switch off.
- Switch off ignition.
- Check the complete fuel system including all 6 return line connections for leaks. [Note: The return lines can only be renewed together with the pressure retention valve as one unit.]
- After completing the repair, road-test the vehicle over a distance of at least 20 km. Accelerate with full throttle at least once. Then inspect the high-pressure section of the fuel system again for leaks. [Note: If there is any air left in the fuel system, the engine may switch to the backup mode ('emergency running' mode) during the road test. Switch off the engine and erase the fault memory. Then continue the road test.]
Other AUDI procedures
- Removing and installing bottom section of intake manifold (left-side) - vehicles from 08.2004 onwards
- Removing and installing bottom section of intake manifold (right-side) - vehicles from 08.2004 onwards
- Removing and installing right-side intake manifold (bottom section) - vehicles from 10.2004 onwards
- Exploded view - intake manifold (bottom section), fuel rail and injectors
- Exploded view - intake manifold (bottom section) with fuel rail
- Intake manifold (bottom section) - exploded view
- Removing and installing turbocharger on vehicles with 2.7 ltr. engine
- Removing and installing bottom section of intake manifold (left-side)
- Checking hydraulic valve compensation elements – Audi A6 C6
- Renewing diesel direct injection system control unit J248
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.