TorqFix

Removing and installing intermediate flange - engine code letters BDG, BDH — AUDI

Removing and installing intermediate flange - engine code letters BDG, BDH on Audi: 17 steps, engines AFB, AKE, AKN, AYM.

Workshop procedure for AUDI — the exact step sequence and torque figures, straight from real workshop data.

17 steps 9 engine codes engine codes merged from 2 documented variants

🧭 Before you start

Fits: Audi A4 Cabriolet B6/B7 (8H), Audi A4 B6/B7 (8E)

  • Renewed: gaskets

Don't miss

  • Renew gaskets and self-locking nuts.Fit all cable ties in the original positions when installing.

🔧 Engine codes this applies to

📐 60 workshop diagrams for AFB

Real factory drawings for this job — timing marks, bolt locations and routing. Locked in the free view.

Removing and installing intermediate flange - engine code letters BDG, BDH — AFB · diagram 1
Removing and installing intermediate flange - engine code letters BDG, BDH — AFB · diagram 2
Removing and installing intermediate flange - engine code letters BDG, BDH — AFB · diagram 3
Removing and installing intermediate flange - engine code letters BDG, BDH — AFB · diagram 4
Removing and installing intermediate flange - engine code letters BDG, BDH — AFB · diagram 5
Removing and installing intermediate flange - engine code letters BDG, BDH — AFB · diagram 6
Removing and installing intermediate flange - engine code letters BDG, BDH — AFB · diagram 7
Removing and installing intermediate flange - engine code letters BDG, BDH — AFB · diagram 8
+ 52 more diagrams

📋 Procedure

  1. Remove front exhaust pipe with main catalytic converter: vehicles with front-wheel drive , vehicles with four-wheel drive .
  2. Remove starter catalytic converter: vehicles with front-wheel drive , vehicles with four-wheel drive .
  3. Remove turbocharger .
  4. Remove exhaust manifold together with intermediate pipe: left-side , right-side .
  5. Detach vacuum hose (3).
AFB? Steps differ between engine variants — check this job against your exact car before you commit to it. Check my car — free →
  1. Remove nuts (2) and bolts (1) and (4).
  2. Remove mechanical exhaust gas recirculation valve together with connecting pipe.
  3. Release cable tie (1) at rear of heat shield and move wiring clear.
  4. Unscrew bolts (arrows) and detach heat shield (2) from intermediate flange.
  5. Unbolt coolant pipe at rear of oil filter bracket.
  6. Remove top left securing bolt (arrow 1) on engine/gearbox flange.
  7. Unscrew bolts (arrows 2).
  8. Guide out intermediate flange to rear right. [Note: Renew gaskets and self-locking nuts.Fit all cable ties in the original positions when installing.]
  9. Install exhaust manifold together with intermediate pipe: left-side , right-side .
  10. Install turbocharger .
  11. Install starter catalytic converter: vehicles with front-wheel drive , vehicles with four-wheel drive .
  12. Install front exhaust pipe with main catalytic converter: vehicles with front-wheel drive , vehicles with four-wheel drive .
Workshop diagrams

Ask TorqFix about your Audi AFB — it answers with the exact sequence for that engine and the workshop drawing for each step. First question is free after a 20-second sign-up, no card.

Ask about your Audi AFB — free → or sign up free to see the drawings

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix →

Workshop data on this page last updated 20 Sep 2026.