TorqFix

Removing and installing injectors (piezo injectors): VW

Removing and installing injectors (piezo injectors) — VW. 27 source steps and 1 torque figure. Check the document conditions against your vehicle.

27 steps 8 engine codes 1 torque figure Showing one source document; this title group contains 2 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Special tools named: V.A.G 1331/6
  • Replacement notes from the steps (read the conditions below): Fit new copper oil seal.

Don't miss

  • Ensure that high-pressure lines are not under tension.
  • The return lines can only be renewed together with the pressure retention valve as one unit.
  • If there is any air left in the fuel system, the engine may switch to the backup mode ('emergency running' mode) during the road test. Switch off the engine and erase event memory . Then continue the road test.

🔧 Engine codes recorded for this source

This source is from the Volkswagen commercial-vehicle documentation. The previous catalogue make label was incorrect; confirm the source vehicle and engine before use.

🔩 Torque settings

Values can differ between engine variants — check the code stamped on your block.

TorqueFastener / step
22 Nm (16 lb-ft)Install retainer, and tighten securing bolt to 22 Nm.

ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.

📋 Procedure

  1. ⚠ Always read rules for cleanliness and instructions for working on fuel system .Follow these instructions before starting work and while working on the fuel system. When a new injector is installed, the adaptation value for the new injector must be written into the engine control unit Used injectors, retainers and high-pressure lines may only be re-installed on the same cylinder. — Remove air filter (see the separate procedure).
  1. ⚠ Mark cylinder numbers on injectors. The adaptation value for the injectors is stored in the engine control unit. Observe rules for cleanliness when working on the injection system. Plug open connections with suitable sealing caps immediately. — Pull connectors off at injectors to be removed.
  2. Pull release pins (1) upwards (arrow) to detach return line connections from injectors.
  3. Loosen union nut of high-pressure line (2) on injectors using tool insert, AF 17 V.A.G 1331/6.
  4. Remove high-pressure accumulator (see the separate procedure).
  5. Release securing bolt (1) and remove retainer (2).
  6. Detach injector units using tool set for FSI engines T10133 or puller T10055 and adapter T10055/1.
  7. After removal, lay injectors on a clean cloth.
  1. Spray tip of injector nozzle with rust-releasing spray. Wait approx. 5 minutes and wipe off soot particles and oil with a cloth.
  2. Carefully clamp seized copper oil seals in a vice until copper oil seal is just prevented from turning between jaws. Then carefully pull and twist the injector out of the copper seal by hand.
  3. Clean sealing surface underneath copper seal.
  4. Fit new copper oil seal.
  5. Be careful when fitting new O-ring for fuel return connection in order to avoid damaging O-ring.
  6. To remove carbon deposits from the injector sealing surface, clean the injector seat in the cylinder head with a cloth soaked in engine oil or rust solvent. Take care not to damage the sealing surface.
  1. Fit injectors into cylinder head.
  2. Install retainer, and tighten securing bolt to 22 Nm. — 22 Nm (16 lb-ft)
  3. Remove high-pressure accumulator with high-pressure lines (see the separate procedure).
  4. Tighten union nuts on high-pressure lines finger-tight initially.
  5. Ensure that high-pressure lines are not under tension.
  6. Tighten union nuts of high-pressure lines on injectors using torque wrench V.A.G 1331 and tool insert, AF 17 V.A.G 1331/6.
  7. Tighten union nuts of high-pressure lines on high-pressure accumulator.
  8. Press return line connections carefully over O-ring and onto injector (check O-ring for damage first). The catch should engage audibly. Then press release pin down carefully.
  1. ⚠ Route return lines such that they do not touch the connecting pipes of the exhaust gas recirculation system. — Connect connectors to injectors. [Note: After at least one injector has been renewed, the "“injector delivery calibration”" and "“injector voltage calibration”" values for the new injector(s) must be written into the engine control unit .Additionally, check that the injector delivery calibration values and injector voltage calibration values have been entered correctly for all the other injectors. Do not under any circumstances attempt to re-enter these calibration values if the correct values are already stored in the engine control unit.]
  1. Run engine at idling speed for several minutes and then switch off.
  2. Switch off ignition.
  3. Check the complete fuel system and return line connections for leaks. [Note: The return lines can only be renewed together with the pressure retention valve as one unit.]
  1. Then carry out a road test. In this, the engine must reach its operating temperature and be accelerated at full-throttle at least once. Then, check high-pressure system again for leaks (see the separate procedure). [Note: If there is any air left in the fuel system, the engine may switch to the backup mode ('emergency running' mode) during the road test. Switch off the engine and erase event memory (see the separate procedure). Then continue the road test.]

📐 3 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 3 workshop diagrams for this job Ask about your VW BJJ — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.