Removing and installing high-pressure sender G65 for air conditioning system: Audi Q7 (4L)
Removing and installing high-pressure sender G65 for air conditioning system — Audi Q7 (4L). Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi Q7 (4L, 2005–2015)
Don't miss
- The right section of the plenum chamber front wall (A) is attached to the vehicle by means of the bolts (C) and (D). A gasket (E) is fitted between the plenum chamber front wall and the vehicle body.
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 5 Nm (3.7 lb-ft) | Remove high-pressure sender G65(B) (tightening torque: 5 Nm). |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- Remove plenum chamber cover General body repairs, exterior50.
- Remove right section of plenum chamber front wall (A)General body repairs, exterior50. [Note: The right section of the plenum chamber front wall (A) is attached to the vehicle by means of the bolts (C) and (D). A gasket (E) is fitted between the plenum chamber front wall and the vehicle body.]
- Unplug connector (A).
- Remove high-pressure sender G65(B) (tightening torque: 5 Nm). — 5 Nm (3.7 lb-ft)
- Renew O-ring (C) and Electronic parts catalogue. [Note: The cooling output cannot be checked if the high-pressure sender G65 is removed; the front operating and display unit (Climatronic control unit J255) does not switch on the compressor. The refrigerant circuit remains closed (connection with valve).Checking operation of high-pressure sender G65 and signal supplied .Moisten the O-ring (C) with a small quantity of refrigeration oil before fitting .]
📐 2 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other AUDI procedures
- Removing and installing air conditioner high-pressure sender G65
- Assembly overview - poly-V-belt drive for vehicles with air conditioning system
- Bleeding fuel system after installing high-pressure pump
- Bleeding fuel system after installing high-pressure pump - vehicles with engine codes BMK, BPP, BSG, BNG, ASB
- Bleeding fuel system after installing high-pressure pump - vehicles with engine codes BUG and BUN
- Checking activation signal for air conditioning system compressor regulating valve N280
- Removing and installing toothed belt – Audi
- Removing engine – Audi A8 D3
- Removing camshaft timing chain from camshafts – Audi A6/A7 C7
- Installing engine – Audi A8 D4
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.