Removing and installing high-pressure pumps, high-pressure pumps with fuel supply line — AUDI
Removing and installing high-pressure pumps, high-pressure pumps with fuel supply line on Audi: 19 steps, engines BYH, CNDA.
Workshop procedure for AUDI — the exact step sequence and torque figures, straight from real workshop data.
🧭 Before you start
Fits: platform code 42
- Renewed: o-ring
Don't miss
- Do not attempt to bend high-pressure pipes to a different shape.
- Always renew O-ring.
- Lubricate thread of union nut with clean engine oil.The connections of the high-pressure pipes must not be damaged.Do not attempt to bend high-pressure pipes to a different shape.
- Ensure that fuel lines are not under tension.
📋 Procedure
- ⚠ The fuel system operates under high pressure. The pressure in the high-pressure part of the injection system must be reduced to a residual pressure prior to opening the system .A clean cloth must then be wrapped around the connection and the residual pressure dissipated by carefully loosening the connection. — R8 Coupé: Remove engine compartment trim panel on relevant side 53.
- R8 Spyder: Remove engine compartment trim panel (1)53.
- Unplug electrical connector (3) for fuel metering valve N290.
- Loosen union nuts for high-pressure pipe (1) and fuel supply line (2).
- Remove bolts (arrows) for high-pressure pump. [Note: Do not attempt to bend high-pressure pipes to a different shape.]
- Carefully pull out high-pressure pump.
- Pull roller tappet out of cylinder head.
- Unplug electrical connector (1) at fuel metering valve 2N402.
- Loosen union nuts for high-pressure pipe (2) and fuel supply line (3).
- Remove bolts (arrows) for high-pressure pump. [Note: Do not attempt to bend high-pressure pipes to a different shape.]
- Carefully pull out high-pressure pump.
- Pull roller tappet out of cylinder head. [Note: Always renew O-ring.]
- Fit roller tappet in cylinder head.
- Only lift fuel lines slightly to fit high-pressure pump.
- Fit high-pressure pump in cylinder head and secure in position. [Note: Lubricate thread of union nut with clean engine oil.The connections of the high-pressure pipes must not be damaged.Do not attempt to bend high-pressure pipes to a different shape.]
- Tighten union nut on high-pressure pipe hand-tight initially.
- Ensure that fuel lines are not under tension.
- To tighten union nuts, use torque wrenchV.A.G 1331 with appropriate tool insert.
- Check for leaks .
Other AUDI procedures
- Removing and installing oil filter housing - vehicles with fuel line
- Removing and installing air cleaner housing - R8 Coupé with manual gearbox/R tronic gearbox 086
- Removing and installing radiator fans
- Removing and installing engine oil cooler (mounting plate remains in place)
- Removing and installing oil reservoir - vehicles with dual clutch gearbox 0BZ
- Removing and installing toothed belt – Audi · 56 torque figures
- Removing engine – Audi A8 D3 · 41 torque figures
- Removing camshaft timing chain from camshafts – Audi A6/A7 C7 · 38 torque figures
- Installing engine – Audi A8 D4 · 36 torque figures
- Removing and installing camshaft timing chain · 29 torque figures
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix →Workshop data on this page last updated 20 Sep 2026.