TorqFix

Removing and installing high-pressure pump - vehicles with engine codes BUG and BUN — AUDI

Removing and installing high-pressure pump - vehicles with engine codes BUG and BUN on Audi: 16 steps, engines BUG, BUN, CASA, CASB.

Workshop procedure for AUDI — the exact step sequence and torque figures, straight from real workshop data.

16 steps 4 engine codes

🧭 Before you start

Fits: Audi Q7 (4L, 2005–2015)

  • Renewed: seals

Don't miss

  • Loosen central nut (1) for high-pressure pump shaft using counterhold tool3036.
  • Renew seals and gaskets.Hose connections and hoses for charge air system must be free of oil and grease before assembly.Secure all hose connections with the correct type of hose clips (same as original equipment) Parts catalogue.
  • The high-pressure pump must first be filled with fuel before the engine is started. The high-pressure pump must not be allowed to run while still empty. — Install high-pressure pipes .
  • Bleed fuel system after installing high-pressure pump .

🔧 Engine codes this applies to

📋 Procedure

  1. Remove engine cover panel .
  2. ⚠ Observe rules for cleanliness when working on the injection system . — Unscrew union nuts (1 ... 4) and detach high-pressure pipes.
  3. Remove intake manifold (top section) .
  4. Remove toothed belt for high-pressure pump .
  5. Loosen central nut (1) for high-pressure pump shaft using counterhold tool3036.
BUG? Steps differ between engine variants — check this job against your exact car before you commit to it. Check my car — free →
  1. Remove damper weight.
  2. Use puller T40064 to pull off belt sprocket for high-pressure pump.
  3. Disconnect fuel supply line (2) and fuel return line (1) from high-pressure pump and move clear to one side.
  4. Remove bolts (1 ... 4).
  5. Remove bolts (1) and (3).
  6. Unplug electrical connector (2).
  7. Carefully pull toothed belt cover in direction of (arrow) and lift out high-pressure pump. [Note: Renew seals and gaskets.Hose connections and hoses for charge air system must be free of oil and grease before assembly.Secure all hose connections with the correct type of hose clips (same as original equipment) Parts catalogue.]
  8. ⚠ The high-pressure pump must first be filled with fuel before the engine is started. The high-pressure pump must not be allowed to run while still empty. — Install high-pressure pipes .
  9. Install toothed belt for high-pressure pump .
  10. Install intake manifold (top section) .
  11. Bleed fuel system after installing high-pressure pump .

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix →

Workshop data on this page last updated 20 Sep 2026.