Removing and installing exhaust gas recirculation cooler (low-pressure): Audi A1 (8X) (CUSB)
Removing and installing exhaust gas recirculation cooler (low-pressure) — Audi A1 (8X) (CUSB). Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi A1 (8X, 2010–2018)
- Replacement notes from the steps (read the conditions below): Detach exhaust gas recirculation cooler (2). [Note: Disregard (item 1).] [Note: Renew seals, screw-type clip and hose clips after removal.Secure all hose connections with correct type of hose clips (as original equipment) Electronic parts catalogue.]
Don't miss
- Disregard (item 1).
- Ensure that sliding bush moves easily (unstick if necessary); otherwise clamping force of sliding bush will be insufficient even at correct torque.
🔧 Engine codes recorded for this source
📋 Procedure
- Remove exhaust gas recirculation control motor 2V339.
- Detach gear selector cable and gate selector cable from gearbox, remove cable support bracket and place to one side with selector cables attached 34Selector mechanism; Removing and installing selector mechanism.
- Release catch (arrow) and move bracket for coolant hose clear at exhaust gas recirculation cooler.
- Loosen bolt (1) and remove bolt (2).
- Release hose clip (2) and detach coolant hose.
- Loosen screw-type clip (3) and push towards emission control module.
- Detach exhaust gas recirculation cooler (2). [Note: Disregard (item 1).] [Note: Renew seals, screw-type clip and hose clips after removal. Secure all hose connections with correct type of hose clips (as original equipment) Electronic parts catalogue.]
- Unscrew bolt (1) and remove bracket (2).
- Drive in sliding bush (3) as far as stop (arrow).
- Bring bracket into installation position and screw in bolt until it makes contact. [Note: Ensure that sliding bush moves easily (unstick if necessary); otherwise clamping force of sliding bush will be insufficient even at correct torque.]
- Install gear selector cable and gate selector cable 34Selector mechanism; Removing and installing selector mechanism.
- Install exhaust gas recirculation control motor 2V339.
- Install front exhaust pipe (see the separate procedure).
Other AUDI procedures
- Checking exhaust gas recirculation cooler changeover valve
- Checking exhaust gas recirculation cooler changeover valve N345 and vacuum hoses
- Checking exhaust gas recirculation cooler for leaks
- Checking vacuum hose to vacuum unit on exhaust gas recirculation cooler
- Removing and installing auxiliary cooler for exhaust gas recirculation
- Removing and installing exhaust gas recirculation cooler
- Removing and installing coolant pipes (rear) – Audi A1 CUSB
- Removing and installing valve stem oil seals (cylinder head removed)
- Checking fuel system pressurisation pump G6 (6.0 bar high-pressure pump)
- Removing and installing fuel delivery unit/fuel gauge sender
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.