Removing and installing coolant pipe (front): vehicles with 4/2-way valve — Audi A3 (8P) (CAYB, CAYC)
Removing and installing coolant pipe (front) — vehicles with 4/2-way valve — Audi A3 (8P) (CAYB… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi A3 (8P, 2003–2012)
- Opens: coolant
Don't miss
- Disregard (items 1, 4).
- Disregard (items 2, 3, 4).
📋 Procedure
- Drain coolant (see the separate procedure).
- Remove air cleaner housing (repair group 23).
- Remove battery Electrical system27.
- Remove bolts (arrows) and take out battery tray (1).
- Press release tabs and disconnect crankcase breather hose (1) from cylinder head cover.
- Move clear vacuum hoses (arrows) at air pipe.
- Remove bolt (2), swivel air pipe with connection to rear and detach from turbocharger.
- Unclip wiring harness from retainer (arrow).
- Move clear wiring harnesses (arrows) and electrical connector (1) at bracket.
- Release hose clips (1) and (2) and remove air hose.
- Remove bolts (2, 5) and (arrows).
- Using removal lever80 - 200, move clear electrical wiring and hoses at air pipe (left-side).
- Loosen hose clip (3) and detach air pipe (left-side). [Note: Disregard (items 1, 4).]
- Release hose clips (1) and detach coolant hoses. [Note: Disregard (items 2, 3, 4).]
- Take electrical connector (1) for Hall sender G40 out of retainer.
- Detach bracket from coolant pipe (front).
- Release hose clips (2) and (3) and disconnect coolant hoses.
- Remove bolts (arrows) and detach coolant pipe (front) from 4/2-way valve to left side. [Note: Renew gaskets, seals and O-rings. Hose connections and air pipes and hoses must be free of oil and grease before assembly. Secure all hose connections with the correct type of hose clips (same as original equipment) Electronic parts catalogue.]
- Clean and smoothen sealing surface for O-ring.
- Lightly lubricate O-ring with coolant and slide O-ring onto coolant pipe (front).
- Push coolant pipe (front) into 4/2-way valve.
- Install air pipe (see the separate procedure).
- Install intake connecting pipe (see the separate procedure).
- Install air hoses with screw-type clips (see the separate procedure).
- Electrical connections and routing (see the separate procedure).
- Install battery mounting and battery Electrical system27.
- Install air cleaner housing (repair group 23).
- Fill up with coolant (see the separate procedure).
Other AUDI procedures
- Activation of heater coolant shut-off valve
- Activation of heater coolant shut-off valve N279
- Connection diagram - coolant hoses, vehicles with non-return valve
- Connection diagram - coolant hoses, vehicles without non-return valve
- Contact assignment and operation of coolant shut-off valve relay -J541
- Coolant shut-off valve relay -J541
- Removing and installing high-pressure reservoir (rail) – Audi
- Removing and installing engine bracket
- Checking oil pressure
- Removing and installing Hall sender G40
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.