TorqFix

Removing and installing batteryA, vehicles with high-voltage system: Audi Q5 (8R)

Removing and installing batteryA, vehicles with high-voltage system — Audi Q5 (8R). 22 source steps. Check the document conditions against your vehicle.

22 steps

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi Q5 (8R, 2008–2017)

Don't miss

  • After renewing the battery, it must be adapted .
  • After reconnecting the voltage supply, it is possible that the ESP warning lamp will not go out until the vehicle has been driven several metres.

📋 Procedure

  1. ⚠ Risk of fatal injury if high-voltage components are damaged. Observe the following when working in the vicinity of high-voltage components or wiring:It is not permitted to use cutting or forming tools, other sharp-edged tools or heat sources such as welding, brazing, soldering, hot air or thermal bonding equipment. Before starting work, visually inspect the high-voltage components in the areas involved. Before working in engine compartment, visually inspect power and control electronics for electric driveJX1, electric drive motor V141, air conditioner compressor V470 and high-voltage wiring. Before working on the vehicle underbody, visually inspect the high-voltage wiring and covers. Before working on the rear section of the vehicle, visually inspect the high-voltage wiring and the electro-box with the maintenance connector for high-voltage system TW (see the separate procedure). Visually inspect all potential equalisation lines. Check the following when making the visual inspection:There must be no external damage on any component. The insulation of the high-voltage wiring and potential equalisation lines must not be damaged. There must be no unusual deformation of the high-voltage wiring. All high-voltage components must be identified by a red warning sticker. — Move battery cooling module to service position Heating, air conditioning 87. Battery cooling module.
  2. If fitted, remove bass box Communication 91. Sound system; Removing and installing subwoofer R211.
  3. Connect battery charger to provide back-up power supply Electrical system; General information 27. Charging battery.
  1. ⚠ Switch off ignition. The second battery A1 is STILL connected to the vehicle's electrical system when the ignition is switched ON. — Open cover (6) over negative battery terminal.
  2. Loosen nut (5) a few turns and disconnect battery clamp of earth cable from battery terminal.
  3. Pull off hose (7) for central gas venting system.
  4. Open cover (3) over positive battery terminal.
  5. Loosen nut (2) several turns and disconnect battery clamp of positive cable together with fuse holder ASA from battery terminal.
  1. ⚠ Battery clamp of positive cable should immediately be wrapped in insulating tape and moved to side to prevent short circuits. — Remove bolt (arrow) on battery retainer plate (1).
  2. Lift battery (4) out of luggage compartment. [Note: Only install maintenance-free batteries with the specifications "“TL82506”" (from December 1997 onwards) and "“VW75073”" (from August 2001 onwards).Batteries from the Audi parts range feature a base strip adapter for matching to different retainer flanges. The battery operating instructions give details of when and how to use the base strip adapter.]
  1. ⚠ Observe environmental requirements. When disposing of used batteries, always observe the required disposal procedures for batteries and sulphuric acid Electrical system; General information 27. Battery. — Insert battery in battery retainer so that battery base strip engages in the retainer flanges of the battery retainer (arrow).
  1. Place battery retainer plate (1) in position.
  1. Tighten bolt (arrow) for battery retainer plate.
  2. Attach hose (7) for central gas venting system.
  1. First connect battery clamp (3) of positive cable by hand to positive battery terminal "“+”" and tighten nut.
  2. Unplug electrical connector (2) at battery monitor control unit J367(item 3).
  3. When connecting battery, attach battery clamp of earth cable to negative battery terminal "“–”" by hand and tighten nut (1).
  4. Reconnect connector at battery monitor control unit J367.
  5. Check that battery is firmly secured following installation.
  6. Install battery cooling module Heating, air conditioning 87. Battery cooling module.
  7. After renewing the battery, it must be adapted (see the separate procedure).
  8. Continue to follow the instructions on the display of the vehicle diagnostic tester for a new battery. [Note: After reconnecting the voltage supply, it is possible that the ESP warning lamp will not go out until the vehicle has been driven several metres.]

📐 3 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 3 workshop diagrams for this job Ask about your Audi — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.