TorqFix

Removing and installing alternator: vehicles with 2.0 ltr. TDI engine with SCR catalytic converter (PR number TM4) — Audi A4 B8 (8K)

Removing and installing alternator — vehicles with 2.0 ltr. TDI engine with SCR catalytic… Read available instructions and vehicle application notes.

14 steps

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A4 B8 (8K, 2007–2015)

Don't miss

  • If alternator sticks in bracket, apply a 1/2 inch socket (19 mm) (item 1) at sliding bush.Screw a bolt (M8x45) into sliding bush – and then pull bush out of alternator by screwing in securing bolt (2).
  • Stiff alternator mount bushes must be freed; otherwise the clamping force of the bush will not be adequate even when the bolts are tightened to the correct torque.

📋 Procedure

  1. With ignition switched off, disconnect earth cable at battery (see the separate procedure).
  2. Detach poly V-belt from alternator pulley 13Cylinder block (pulley end); Removing and installing poly V-belt.
  3. Remove coolant pipe (top left), leaving coolant hoses connected 19Coolant pipes; Exploded view - coolant pipes.
  4. Unscrew terminal 30/B+ (item 1).
  5. Unplug electrical connector (2).
  6. Unscrew bolts (arrows). [Note: If alternator sticks in bracket, apply a 1/2 inch socket (19 mm) (item 1) at sliding bush. Screw a bolt (M8x45) into sliding bush – and then pull bush out of alternator by screwing in securing bolt (2).]
  1. Remove nut (1).
  2. Press electrical connector (2) with bracket to side.
  3. Pull coolant pipe to one side and detach alternator (1).
  1. To facilitate positioning of alternator, drive back bushes for securing bolts slightly. [Note: Stiff alternator mount bushes must be freed; otherwise the clamping force of the bush will not be adequate even when the bolts are tightened to the correct torque.]
  1. Install coolant pipe (top left) 19Coolant pipes; Exploded view - coolant pipes.
  2. Install poly V-belt 13Cylinder block (pulley end); Removing and installing poly V-belt.
  3. Connect battery. Steps required (see the separate procedure).
  4. Start engine and check that belt runs properly.

📐 3 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 3 workshop diagrams for this job Ask about your Audi — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.