Installing hose kit and pipe/valve kit: Audi
Installing hose kit and pipe/valve kit — Audi. Original source text. Read the instructions and application notes; confirm the exact vehicle before use.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
📋 Procedure
ℹ️ Torque figures below come verbatim from workshop data — always cross-check against your vehicle's factory manual before final tightening.
Notes:
Do not kink or strain coolant hoses when laying.
Ensure clearance between coolant hoses and assemblies/body components.
Attach spring clips such that hoses, wires and body components cannot be damaged.
Use special tool VAS 5024 A for fitting spring clips at coolant hoses.
Connecting hose module to engine coolant pipe
Attach rear hose connection of hose module -1- to coolant pipe -2- on back of engine. Secure hose connection with spring clip -3-.
Installing T-piece of hose module
Attach T-piece -1- with bolts -2- to wheel housing (engine compartment).
Tightening torque: 20 Nm
Notes:
For vehicles with stud in area of hose module attachment point:
Remove stud.
Insert appropriate rivet nut.
Heed anti-corrosion measures.
Connecting hose module to expansion tank
Slip coolant hose -1- over bottom connection at expansion tank.
Use hose clamp pliers VAS 5024 A to slip spring clip over end of hose module and attach to expansion tank.
Sealing coolant pipe connections at engine
Seal coolant pipe on back of engine with pipe terminating hoses -1- and -2-.
Secure terminating hoses with spring clips.
Fitting coolant pipe at cylinder head
Slacken off bolt for attaching dipstick guide tube to cylinder head.
Secure coolant pipe in position at cylinder head with bolt -1-.
Tightening torque: 10 Nm
Secure coolant pipe holder -3- in position behind dipstick guide tube fastener at cylinder head with bolt -2-.
Tightening torque: 10 Nm
Attaching protective sheeting to longitudinal member
Protective sheeting is only to be bonded on at ambient temperature.
Clean surface to be bonded at longitudinal member, treat with silicone remover and rub dry.
Bond on protective sheeting at positions -1- and -2- on longitudinal member.
Installing coolant shut-off valve -N279 (Bosch)
Unscrew nut -1- at ESP holder.
Screw bolt -2- out of holder.
Unscrew nut -3-.
Note:
"Bosch" and "Woco" coolant shut-off valves have different connection diameters and thus different coolant hoses.
Insert holder and secure with nuts -1-.
Tightening torque: 10 Nm
Tighten bolt -2-.
Tightening torque: 10 Nm
Note:
Bolt -2- is replaced by longer bolt from conversion kit.
Insert shut-off valve and attach to holder with nuts -1- and bolt -2-.
Tightening torque: 10 Nm
Installing coolant shut-off valve -N279 (Woco)
Unscrew nut -1- at ESP holder.
Unscrew bolt -2- from holder.
Unscrew nut -3-.
Note:
"Bosch" and "Woco" coolant shut-off valves have different connection diameters and thus different coolant hoses.
Insert holder and secure with nuts -1-.
Tightening torque: 10 Nm
Tighten bolt -2-.
Tightening torque: 10 Nm
Note:
Bolt -2- is replaced by longer bolt from conversion kit.
Insert shut-off valve and attach with bolts -1- to holder.
Tightening torque: 10 Nm
Connecting coolant hoses to coolant shut-off valve -N279
Attach coolant hose to hose module, route beneath power steering expansion hose and connect to coolant shut-valve.
Route coolant hose -1- downwards from bottom connection -2- towards subframe.
Attach coolant hose -1- to connection of coolant pipe -2-.
Connect opposite end of coolant hose -1- to top connection -3- of coolant shut-off valve -N279.
Attach coolant hose of conversion kit to coolant pipe (return) on right side of engine and route downwards towards subframe.
Note:
Longer end of coolant hose must be connected to coolant pipe.
Hose connection at pump/valve unit
On back of engine, connect coolant hose -1- to coolant pipe (supply) -2- and attach to "coolant supply" connection to pump/valve unit -3-.
Attach coolant hose -1- of conversion kit to "coolant return" connection of pump/valve unit and connect to coolant pipe -2-.
Installing coolant pipe at subframe
Screw out bolts -1-.
Clean tapped holes.
Attach coolant pipe at subframe with bolts -1- to upper anti-roll bar mounts.
Tightening torque 20 Nm
Connect coolant hose -1- to coolant pipe -2-.
Connect coolant pipe -1- at subframe by means of coolant hose -2- from conversion kit to recirculating pump -V55 -3-.
Attach coolant hose -4- to subframe coolant pipe.
TorqFix answers live for your specific car — tell it the engine code to check the available procedures, torque figures and wiring for that variant.
Ask about my car →Other AUDI procedures
- Checking, removing and installing condensation drainage hose with valve
- Checking vacuum hose leading to changeover valve for exhaust gas recirculation cooler N345
- Installing wire repair kit for heat regulation valve unit and coolant circulation pump V50
- Removing and installing coolant pipe (front) - vehicles with 4/2-way valve
- Removing and installing coolant pipe with coolant hose
- Removing and installing hose/pipe assemblies – Audi A2
- Removing and installing toothed belt – Audi
- Removing engine – Audi A8 D3
- Removing camshaft timing chain from camshafts – Audi A6/A7 C7
- Installing engine – Audi A8 D4
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.