Installing gearbox, vehicles as of model year 2010: VW
Installing gearbox, vehicles as of model year 2010 — VW. 52 source steps. Read the instructions and application notes; confirm the exact vehicle before use.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Transporter T5 (7H), VW Transporter T5 (7J), VW Transporter T6 (7E), VW Transporter T6 (7F)
- Opens: clutch fluid
- Replacement notes from the steps (read the conditions below): Renew oil seal (arrow) on right on stub shaft. Always renew self-locking bolts and nuts. Renew oil seal on slave cylinder line connection.
Don't miss
- Always renew self-locking bolts and nuts.
- Ensure that intermediate plate is correctly seated on engine.
- Insert gearbox. It must be possible to guide the engine and gearbox together by hand until the engine flange and gearbox flange make contact all around.
- Do not remove support bracket10 - 222 A until the bolts securing the assembly mounting have been tightened to specified torque. — Install support mounting of front torque reaction support and tighten.
- Lead seal of tachograph sender G75 is only allowed to be attached by authorised specialist workshops Electrical system90.
📋 Procedure
- ⚠ Please observe the following points during all installation work, in particular in the engine compartment, due to the space limitations:Route lines of all kinds and electrical cables so as to re-establish the original wiring. Make sure there is adequate clearance from all moving or hot parts. — Renew circlip (arrow A) and left oil seal (arrow B) on stub shaft.
- Renew oil seal (arrow) on right on stub shaft.
- Grease left and right stub shaft splines (2) with clutch plate spline greaseElectronic Parts Catalogue.
- Clean input shaft splines (1) and lightly grease it using clutch plate spline greaseElectronic Parts Catalogue.
- Always renew self-locking bolts and nuts.
- Check whether dowel sleeves for aligning engine and gearbox are fitted in cylinder block and install if necessary.
- Ensure that intermediate plate is correctly seated on engine.
- Align arms of gearbox support according to holes in adjustment plate.
- Place gearbox on engine and gearbox jack V.A.G 1383 A.
- Align adjustment plate and gearbox parallel to one another.
- Lock safety support(arrow) to gearbox.
- Position engine and gearbox jack V.A.G 1383 A with gearbox support 3282 under gearbox.
- Raise gearbox and guide switch for reversing light switch F4(arrow) past left longitudinal member.
- Align gearbox to engine.
- Insert gearbox. It must be possible to guide the engine and gearbox together by hand until the engine flange and gearbox flange make contact all around.
- Screw one engine/gearbox connecting bolt finger-tight in each side.
- Screw in bolts (arrows) and tighten them.
- After gearbox has been bolted to engine, remove gearbox support 3282.
- Screw in upper engine/gearbox connecting bolts (arrows) and tighten them.
- Screw in engine/gearbox connecting bolts (2) and tighten them.
- If present, install support for diesel particulate filter (1)26Emission control.
- Align engine and gearbox in installation position using spindles of adapter10 - 222 A /16.
- Install left assembly mounting using new hexagon bolts (arrows) and tighten bolts.
- ⚠ Do not remove support bracket10 - 222 A until the bolts securing the assembly mounting have been tightened to specified torque. — Install support mounting of front torque reaction support and tighten.
- If present, connect connector for tachograph sender G75. [Note: Lead seal of tachograph sender G75 is only allowed to be attached by authorised specialist workshops Electrical system90.]
- Renew oil seal on slave cylinder line connection.
- Push pipe/hose assembly (A) with bleeder onto slave cylinder to stop and press clip (arrow) down.
- Remove hose clamp to 25 mm 3094.
- Install starter Electrical system 27. Starter.
- Bolt earth strap (1) onto bottom starter bolt.
- Push on connector for reversing light switch F4(2).
- Push right drive shaft (1) onto gearbox stub shaft.
- Screw bolts (arrows) into rear engine torque reaction support and tighten them to specified torque Running gear, axles, steering 40. Drive shafts; Removing and installing drive shafts.
- Install left drive shaft Running gear, axles, steering 40. Drive shafts; Removing and installing drive shafts.
- Install subframe with bracket for rear torque reaction support Running gear, axles, steering 40. Subframe; Removing and installing subframe.
- Install front exhaust pipe (repair group 26).
- Install catalytic converter bracket.
- Pull back catch of cable support bracket (1)(arrow A) and insert into gearbox (2)(arrow B).
- Lightly grease pin of gearbox selector lever (4) and of relay lever (3) with greaseElectronic Parts Catalogue.
- Press gear selector cable (5) onto gearbox selector lever (4) and gate selector cable (2) onto relay lever (3).
- Check selector cables are securely attached to gearbox selector lever and relay lever.
- Check function of selector mechanism and adjust if necessary or (see the separate procedure).
- Install connecting hose between intake manifold and charge air cooler 21Charge air system.
- Push coolant hose onto coolant pipe and top up coolant.
- Put on deflector caps for suspension struts.
- Install plenum chamber bulkhead panels General body repairs, interior 50. Assembly overview - plenum chamber bulkhead.
- Connect battery.
- Follow procedure after connecting battery Electrical system 27. Battery; Disconnecting and connecting battery.
- Install right cover and battery cover General body repairs, exterior 63. Front bumper.
- Check gear oil (see the separate procedure).
- Bleed clutch mechanism (see the separate procedure).
- Install any noise insulation General body repairs, exterior 50. Noise insulation.
📐 13 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Allocation gearbox - engine, vehicles as of model year 2011
- Allocation gearbox - engine, vehicles up to model year 2010
- Installing gearbox, vehicles as of model year 2010
- Installing gearbox, vehicles as of model year 2011 with all-wheel drive
- Installing gearbox, vehicles as of model year 2011 with front-wheel drive
- Installing gearbox, vehicles up to model year 2010
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.