TorqFix

Checking exhaust gas recirculation valves N18 and N213: Audi A8 D2 (4D) (AKF)

Checking exhaust gas recirculation valves N18 and N213 — Audi A8 D2 (4D) (AKF). Read available instructions and vehicle application notes.

29 steps 1 engine code 1 original source table

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A8 D2 (4D)

  • Replacement notes from the steps (read the conditions below): Replace exhaust gas recirculation valve N18 or N213. Replace exhaust gas recirculation valve. Replace engine control unit.

Don't miss

  • Valve must be in installation position.
  • Fig. shows mechanical exhaust gas recirculation valve for cylinder bank 2 (left).Top air pipe must be removed to disconnect hose from mechanical exhaust gas recirculation valve for cylinder bank 1 (right).

🔧 Engine codes recorded for this source

AKF

📋 Procedure

  1. Unplug connector at valve to be checked.
  1. Detach hose at vacuum connection (2); leave hose at connection (1) attached. [Note: Valve must be in installation position.]
  1. Connect vacuum hand pump V.A.G 1390 to vacuum connection (2).
  2. Use test lead from adapter set to connect contact (2) of solenoid valve to battery positive.
  3. Connect contact (1) to earth.
  1. Disconnect vacuum hose at relevant mechanical exhaust gas recirculation valve (arrow). [Note: Fig. shows mechanical exhaust gas recirculation valve for cylinder bank 2 (left).Top air pipe must be removed to disconnect hose from mechanical exhaust gas recirculation valve for cylinder bank 1 (right).]
  1. Use vacuum hand pump to generate vacuum.
  1. Detach connection between contact (1) and earth.
  2. Use vacuum hand pump to generate vacuum.
  1. Replace exhaust gas recirculation valve N18 or N213.
  1. Connect multimeter (voltage measuring range) to contact (2) and battery positive.
  2. Switch on ignition.
  1. Use current flow diagram to repair wiring.
  1. Unplug connector at valve to be checked.
  1. Connect up multimeter (resistance measuring range) between contacts (1) and (2) at valve.
  1. Replace exhaust gas recirculation valve.
  1. Slacken off cross-head bolts (1) at electronics box in plenum chamber.
  2. Unclip plenum chamber cover (2) at front at bulkhead (arrows).
  3. Detach plenum chamber cover.
  4. Prise out cover (1) in scuttle panel trim and slacken off rear cross-head bolt (rear right arrow).
  5. Slacken off the remaining cross-head bolts (arrows).
  6. Detach cover for electronics box in plenum chamber.
  7. Screw out bolt (arrow).
  8. Disengage retainer.
  9. Detach diesel direct injection system control unit J248(Item 1). Release and unplug connectors.
  10. With ignition switched off, connect test box V.A.G 1598/30 to connectors of diesel direct injection system control unit J248 only (not to actual control unit).
  11. Check for open circuit and short to earth or positive in the following wiring:
  1. Repair wiring if necessary.
  1. Replace engine control unit.

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.