Checking charge pressure control solenoid valve N75 and vacuum hoses: VW (CAYD, CAYE)
Checking charge pressure control solenoid valve N75 and vacuum hoses — VW (CAYD, CAYE). 16 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
- Special tools named: VAS 6213
- Replacement notes from the steps (read the conditions below): Renew vacuum hose. Renew charge pressure control solenoid valveN75.
Don't miss
- Do not use screws or threaded bolts.
- When fitting intake connecting pipe to turbocharger, ensure that intake connecting pipe is correctly seated on stud of turbocharger. (arrow).
🔧 Engine codes recorded for this source
This source is from the Volkswagen commercial-vehicle documentation. The previous catalogue make label was incorrect; confirm the source vehicle and engine before use.
📋 Procedure
- Remove crankcase breather hose (1), press release buttons for this.
- Unclip vacuum lines (arrows) and place to one side.
- Remove intake hose (3) on air filter.
- Unscrew bolt (2) (captive bolt). Twist intake hose (3) clockwise out of its holder and remove it.
- Pull off vacuum hose (arrow) on bottom connection of charge pressure control solenoid valve N75.
- Seal open end of hose with suitable plug from engine bung set VAS 6122. [Note: Do not use screws or threaded bolts.]
- Pull off vacuum hose (arrow) from connection.
- Connect hand vacuum pump VAS 6213 to removed vacuum hose (arrow) and generate a partial vacuum of 0.6 bar.
- Observe pressure gauge of hand vacuum pump VAS 6213 for approx. 30 seconds.
- Renew vacuum hose.
- Connect hand vacuum pump VAS 6213 with vacuum hose from VAS 6213 to bottom connection of charge pressure control solenoid valve N75 and generate a partial vacuum of 0.6 bar.
- Observe pressure gauge of hand vacuum pump VAS 6213 for approx. 30 seconds.
- Renew charge pressure control solenoid valve N75.
- First pull vacuum hose off at hand vacuum pump VAS 6213.
- Reconnect vacuum hose on T-piece and on charge pressure control solenoid valve N75.
- When fitting intake connecting pipe to turbocharger, ensure that intake connecting pipe is correctly seated on stud of turbocharger. (arrow).
📐 4 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Checking charge pressure control solenoid valve N75 – VW
- Changing vacuum unit with position sender for charge pressure positioner G581.
- Checking vacuum hoses leading to non-return valve, solenoid valves N220 and N75 changeover valve N345
- Checking vacuum hoses to non-return valve, solenoid valve N75, changeover valve N345 and vacuum reservoir
- Checking vacuum hoses to non-return valve, solenoid valves N220 and N75, changeover valve N345 and vacuum reservoir
- Removing and installing vacuum unit for charge pressure control valve
- Removing and installing charge air pipe
- Check pressure retention valve in fuel return line
- Removing and installing poly V-belt, vehicles with air conditioning system
- Emptying fuel tank, front-wheel drive, engine codes BJB, BLS, BSU, BDJ, BST, BMM
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.