6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Separating engine and automatic gearbox — AUDI
6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Separating engine and… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi Q7 (4L, 2005–2015)
- Special tools named: VAS 6131/12, VAS 6131/13, VAS 6131/10
Don't miss
- The other support elements remain unchanged.
- Disregard items (1, 2 and 3).
- Disregard items marked (1 and 3).Illustration shows gearbox carrier in installation position.
- Disregard item (1).
- Disregard (arrows).
📋 Procedure
- Set up scissor-type assembly platform VAS 6131 A with support set for Audi VAS 6131/10 and additional parts from supplementary set VAS 6131/12 and VAS 6131/13 as follows: [Note: The other support elements remain unchanged.]
- Detach electrical connector at retainer (arrow).
- Remove bolt (4). [Note: Disregard items (1, 2 and 3).]
- Fit support VAS 6131/13-7 to front right engine support and secure with bolt M10x65.
- Secure support VAS 6131/13-7 to scissor-type assembly platform.
- Place support elements from VAS 6131/12 and VAS 6131/13 under front of ATF oil pan, as shown in illustration.
- Move support elements from VAS 6131/10, VAS 6131/12 and VAS 6131/13 into position to support propshaft, as shown in illustration.
- Unscrew bolts (2) from bracket for main catalytic converters. [Note: Disregard items marked (1 and 3).Illustration shows gearbox carrier in installation position.]
- Unscrew bolts (arrows) and remove main catalytic converters.
- Remove bolt (2) at bracket for starter catalytic converters. [Note: Disregard item (1).]
- Move electrical wiring to Lambda probes clear.
- Unscrew nuts (arrows) and remove starter catalytic converters.
- Remove bolts (arrows) connecting front propshaft to transfer box.
- Remove bolts (1 and 2) for rear coolant pipes. [Note: Disregard (arrows).] [Note: Lay a cloth under the connection to catch escaping ATF.Observe rules for cleanliness when working on automatic gearbox 00.]
- Unscrew bolt (3) and detach ATF lines from gearbox.
- Remove bolt (arrow).
- ATF lines remain in installation position..
- Remove bolt (2) for B+ wiring on bracket.
- Remove nuts (1) and detach bracket.
- Detach heat insulation sleeve from starter.
- Detach protective caps.
- Unscrew electrical wiring from starter:
- Unscrew bolts (1) and (4) and remove starter.
- When loosening torque converter bolts, counterhold crankshaft by applying spanner to bolt on vibration damper.
- Remove 3 bolts for torque converter through opening for starter (turn crankshaft 1/3 turns in normal direction of rotation each time).
- Remove remaining bolts securing engine to gearbox.
- Loosen clamping bolts (1) on sides of scissor-type assembly platform VAS 6131 A and pull rear section of platform together with gearbox towards rear (arrow); simultaneously separate torque converter from drive plate through opening of removed starter.
- Secure the torque converter in the gearbox using support bridge30-211 A to prevent it falling out.
Other AUDI procedures
- 10-cylinder direct petrol injection engine (5.0 ltr. 4-valve turbo RS 6), mechanics — Removing engine
- 10-cylinder direct petrol injection engine (5.0 ltr. 4-valve turbo RS 6), mechanics — Installing engine
- 10-cylinder direct petrol injection engine (5.0 ltr. 4-valve turbo RS 6), mechanics — Separating engine and gearbox
- 10-cylinder direct petrol injection engine (5.0 ltr. 4-valve turbo RS 6), mechanics — Securing engine to engine and gearbox support
- 10-cylinder direct petrol injection engine (5.2 ltr. 4-valve), mechanics — Installing engine
- 10-cylinder direct petrol injection engine (5.2 ltr. 4-valve), mechanics — Removing engine
- Removing and installing camshaft drive timing chain, vehicles with vacuum pump
- Removing and installing radiator cowl – Audi Q7
- Removing and installing anti-theft engine control unit
- Removing and installing intake manifold lower part with fuel rail
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.