TorqFix

6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support — AUDI

6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support on Audi: 10 steps, engines BHK.

Workshop procedure for AUDI — the exact step sequence and torque figures, straight from real workshop data.

10 steps 2 engine codes

🧭 Before you start

Fits: Audi Q7 (4L, 2005–2015)

  • Special tools named: VAS 6101, VAS 6131/13

Don't miss

  • Engine cross member remains in installation position.
  • Disregard items (1, 2 and 3).Illustration shows the installation position on vehicles with automatic gearbox.
  • Take up weight of engine with workshop hoist, but do not lift.
  • Disregard items marked (4 and arrow).

🔧 Engine codes this applies to

📐 7 workshop diagrams for BHK

Real factory drawings for this job — timing marks, bolt locations and routing. Locked in the free view.

6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support — BHK · diagram 1
6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support — BHK · diagram 2
6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support — BHK · diagram 3
6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support — BHK · diagram 4
6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support — BHK · diagram 5
6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support — BHK · diagram 6
6-cylinder direct petrol injection engine (3.6 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support — BHK · diagram 7

📋 Procedure

  1. Remove banjo bolt (1) for pressure pipe for power steering.
  2. Remove bolts for engine mountings (arrows) (left and right). [Note: Engine cross member remains in installation position.]
  3. Detach rear coolant pipes from coolant hoses (arrows). [Note: Disregard items (1, 2 and 3).Illustration shows the installation position on vehicles with automatic gearbox.]
  4. Attach lifting tackle3033 to engine lifting eyes and workshop hoistVAS 6100 with lift arm extension (workshop hoist)VAS 6101 as shown in illustration.
  5. Take up weight of engine with workshop hoist, but do not lift.
BHK? Steps differ between engine variants — check this job against your exact car before you commit to it. Check my car — free →
  1. Remove support VAS 6131/13-7 from engine.
  2. Lift off engine from engine cross member.
  3. Secure engine to engine and gearbox supportVAS 6095 as shown in illustration.
  4. When using engine bracket3269, remove bolts (1 ... 3) and remove engine support with engine mounting. [Note: Disregard items marked (4 and arrow).]
  5. Secure engine bracket3269 to cylinder block as shown in illustration.
Workshop diagrams

Ask TorqFix about your Audi BHK — it answers with the exact sequence for that engine and the workshop drawing for each step. First question is free after a 20-second sign-up, no card.

Ask about your Audi BHK — free → or sign up free to see the drawings

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix →

Workshop data on this page last updated 20 Sep 2026.