Sealing metering device — VW
Sealing metering device — VW. 28 source steps and 4 torque figures. Read the instructions and application notes; confirm the exact vehicle before use.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Passat B5 (3B)
- Replacement notes from the steps (read the conditions below): Carefully lever the old seal off its seat and replace it. Ensure the "“lug”" is seated correctly (arrow).
Don't miss
- Connect vehicle diagnosis, testing and information systemVAS 5051, engine must run at idling speed.
- Mark position of metering device in relation to pump housing using a scriber (arrow).
- Take note of signs of corrosion or deposits in the flange area.
- Carefully lever the old seal off its seat and replace it. Ensure the "“lug”" is seated correctly (arrow).
- Ensure that the ball pin of the metering adjuster (1) engages properly in the recess of the metering adjuster (2). — Fit securing bolts of metering device loosely by hand.
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 20 Nm (15 lb-ft) | Fit additional bracket T10108/1 on injection pump flange and tighten bolts (A) to 20 Nm. |
| 9 Nm (6.6 lb-ft) | Tighten securing bolts -with exception of the special bolt- to 9 Nm in diagonal sequence. |
| 9 Nm (6.6 lb-ft) | Fit securing bolts and tighten to 9 Nm. |
| 27 Nm (20 lb-ft) | Fit return connection and tighten to 27 Nm. |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- Set the injection quantity of the injection pump as follows:
- Connect vehicle diagnosis, testing and information system VAS 5051, engine must run at idling speed.
- Select operating mode "“Self-diagnosis”".
- Select "“Engine electronics”" button on display.
- Select "“Read measured value block”" button on display.
- Select "“1.-.Display group 1”" on the keyboard.
- Observe the value seen from the top at second position. (equates to 2.2...9 mg/stroke).
- Make a note of the injection quantity.
- Remove injection pump (see the separate procedure).
- Remove return connection and drain the injection pump by holding it with the return hole down. Catch escaping fuel.
- Fit additional bracket T10108/1 on injection pump flange and tighten bolts (A) to 20 Nm. — 20 Nm (15 lb-ft)
- Secure injection pump using the additional bracket T10108/1 in a vice.
- Mark position of metering device in relation to pump housing using a scriber (arrow).
- Remove cable from fuel shut-off valve N109 with bracket.
- Unscrew bolts (A).
- Unscrew the special bolt (B) using triangle keyT 10366.
- Carefully swing the metering device completely to one side. [Note: Take note of signs of corrosion or deposits in the flange area.]
- Carefully lever the old seal off its seat and replace it. Ensure the "“lug”" is seated correctly (arrow).
- Place the metering device carefully on the injection pump.
- ⚠ Ensure that the ball pin of the metering adjuster (1) engages properly in the recess of the metering adjuster (2). — Fit securing bolts of metering device loosely by hand.
- Move metering device to "“scriber mark”".
- Tighten securing bolts -with exception of the special bolt- to 9 Nm in diagonal sequence. — 9 Nm (6.6 lb-ft)
- Unscrew securing bolts of metering device cover and remove cover. [Note: Take note of signs of corrosion or deposits in the flange area.]
- Carefully lever the old seal off its seat and replace it. Ensure the "“lug”" is seated correctly (arrow).
- Place cover on injection pump.
- Fit securing bolts and tighten to 9 Nm. — 9 Nm (6.6 lb-ft)
- Fit return connection and tighten to 27 Nm. — 27 Nm (20 lb-ft)
- Install injection pump and fill it via the return line using diesel extractor VAS 5226. [Note: When the metering device is loosened, the injection quantity has to be checked and, if necessary, corrected .]
📐 6 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Assembly order, gearbox »with« retaining ring (A) for input shaft sealing cover
- Assembly order, gearbox »without« retaining ring (A) for input shaft sealing cover
- Assembly overview - sealing flange and dual-mass flywheel/drive plate
- Assembly overview - Sealing flange, belt pulley end.
- Assembly overview - sealing flange on gearbox side and dual-mass flywheel/drive plate
- Bleeding fuel line to metering pump V54 (filling with fuel)
- Checking exhaust gas recirculation
- Removing and installing fuel gauge sender 2G169
- Checking and adjusting injection quantity – VW 1.9 TDI
- Checking turbocharger and charge pressure
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.